background image

Platform and Ladder Installation

Remove platform and ladder assembly from cold

water basin.  Hang pre-assembled platform by

inserting top guide pins into fan deck notches
(shown in Figure 15, Detail A).  Secure with 

tappers.  Assemble lower platform clamps and

secure to side of tower, tightening nuts and

bolts shown in Figure 15, Detail B.

Optional Factory Pre-Wired Terminal Box

BAC offers an optional terminal box with factory
pre-wiring for PT2 models 0412, 1009, 1012 and

1212.  When this option is ordered, the tower fan

motor(s) and vibration cutout switch are wired at
the factory (through flexible conduit) and 
terminated on the outside face of the BAC unit in
a clearly marked, 304 Stainless Steel, Nema 3R
terminal box (see Figure 16 for the exterior 
location of the box on the tower).The box 
includes a cover plate, which once removed 
reveals an easy-to-follow wiring diagram and   
modular terminal blocks.  Remove the cover 
plate, and install the collar (which ships in the 
tower’s cold water basin) which has
pre-punched conduit holes.  Wiring from the 
terminal blocks to the unit controls is sized, 
provided and installed by others.  After the 
controls are wired, reinstall the cover plate on 
the terminal box.

Sloped Ladder Installation

Remove ladder from cold water basin.  Slide the 
ladder bracket assembly (attached to side of 
ladder) into the ladder mounting guides located
on the side of the tower (Figure 16).  Align the bolt
holes and install the hardware through the 
ladder mounting bracket and ladder mounting
guides, tighten.

Figure 15

Figure 16

8

Detail A

Detail B

R242

Содержание PT2

Страница 1: ...uld be checked thoroughly to ensure all required items have been received and are free of any shipping damage prior to signing the bill of lading The following parts should be inspected Sheaves and Belts Bearings Bearing Supports Fan Motor s Fan s and Fan Shaft s Fan Guard s Float Valve Assembly s Water Distribution System Fill Cold Water Basin Strainer s Interior Surfaces Exterior Surfaces Louver...

Страница 2: ...s equipment Proper care procedures and tools must be used in handling lifting installing operating maintaining and repairing this equipment to prevent personal injury and or property damage Freeze Protection Cooling towers must be protected by mechanical and operational methods against damage and or reduced effectiveness due to possible freeze up Please refer to the Product and Applications Handbo...

Страница 3: ...le Section Upper Section Upper Section One Piece PT2 Model Number H distance from lift point to lifting device in feet Lower Section Upper Section PT2 0412 16 8 PT2 0709 14 10 PT2 0809 14 12 PT2 0812 16 12 PT2 1009 14 14 PT2 1012 16 14 PT2 1212 16 16 Figure 3 shows the proper rigging and assembly of units that ship in three sections optional 3 Figure 1 Figure 3 Figure 2 H H H H H ...

Страница 4: ...y a layer of 1 8 x 1 foam tape around the face of the flange over the centerline of the holes As illustrated in Figure 4 insert 3 8 self tapping screws in each hole from the upper section into the middle section and tighten Note On quad installations it is suggested that cells subsequent to the first have the upper and lower sections assem bled on the support foundation adjacent to the final mount...

Страница 5: ...ng the same procedure Refer to Figure 6 4 Using drift pins to align the bolt holes place the flume box over the opening in the basin of Cell 1 and fasten into place Insert the 3 8 self tapping screws or bolts from the flume box into the basin wall as illustrated in Figure 7 Note Flume boxes furnished with units constructed with stainless steel basins are assembled with stainless steel bolts washer...

Страница 6: ...sure Plate Installation Figures 9 and 10 1 Thread 3 8 self tapping screws from the flume box into the basin wall with the positive closure plate as shown 2 Position the neoprene gasket and positive closure plate over the bolts and fasten in place with 3 8 wing nut and flat washers Water Baffles For multi cell PT2 Cooling Towers water baffles join the air louver sections to prevent leaks To install...

Страница 7: ...ections 90 apart The piping connection is a bolt circle designed to fit an ASME Class 150 flat flange with a full face gasket To install the side outlet depressed sump box follow the steps below 1 Wipe the edges around the opening in the cold water basin to remove any dirt or moisture that may have accumulated during shipment Apply a layer of 1 8 x 1 butyl sealer tape around the opening in the bas...

Страница 8: ...tainless Steel Nema 3R terminal box see Figure 16 for the exterior location of the box on the tower The box includes a cover plate which once removed reveals an easy to follow wiring diagram and modular terminal blocks Remove the cover plate and install the collar which ships in the tower s cold water basin which has pre punched conduit holes Wiring from the terminal blocks to the unit controls is...

Отзывы: