Rev. 1.0
5
1.
Powder blocking strip
(under front top cover)
1. Vented oven lid
2. Vacuum cooling cylinder
3. Cooling fans
4. Motorized take-up reel
Страница 1: ...Installation and Operation Manual S N Rev 1 0...
Страница 2: ...activities You made an excellent choice When you need service or technical help please let us know your purchase invoice number This will make it easier to provide you with correct service Azonprinte...
Страница 3: ...unit in case of failure or malfunction and contact your distributor for service information 1 1 Symbols that may be used in this manual This symbol informs about a situation where a safety risk might...
Страница 4: ...y other appliance 2 2 Other prohibitions dangerous procedures Using any parts other than genuine Azon approved manufactured parts can void the warranty Improper installation adjustment alteration serv...
Страница 5: ...escription 3 3 Functional description 3 1 General Protno shakers are Electrically heated Heated by infrared tubes Have both auto manual interface Mesh belt driven Electronically controlled Automatical...
Страница 6: ...Rev 1 0 4 3 2 1 Component Locations 1 Powder box Power Switch 2 Multifunction relay array 3 PLC touch screen 4 Powder recycle drawer 5 Primary Power On Switch 1 Powder box...
Страница 7: ...Rev 1 0 5 1 Powder blocking strip under front top cover 1 Vented oven lid 2 Vacuum cooling cylinder 3 Cooling fans 4 Motorized take up reel...
Страница 8: ...Rev 1 0 6 There are two vacuum cylinders front and back to ensure aligned media feed through the system 2 zone filtration device includes both charcoal and HEPA filtration...
Страница 9: ...Rev 1 0 7 Conveyor belt Recycled powder drawer...
Страница 10: ...on of the Azon Pronto Plus Shaker 2 The manual mode allows the user manually control the switches of each device function of the unit 3 Heating temperature control actual 4 Preheating temperature cont...
Страница 11: ...e white is off and red is on 2 X3 denotes the operation of the sensor when the film has passed through the shaker to the take up reel 3 906 whether the belt is working the red light is on The white li...
Страница 12: ...e 2 vacuum cylinders front and rear 9 Mesh belt speed controls the speed of the conveyor belt in which the larger the value the faster the running speed 5 0 Operational Procedures Once the printer has...
Страница 13: ...r the print linkage mode The film will then be automatically wound by the take up to complete the printing process Recycling the hot melt powder is accomplished simply by brushing the powder from the...
Страница 14: ...1 Number Connect Location T1 A1 C1 3 L2 C1 5 L3 T1 B1 C1 L1 T1 C1 T2 E1 AC contactor C1 Number Connect Location C1 A1 C1 1 L1 C1 1 L1 T1 B1 C1 2 T1 T2 I1 T2 J1 C1 3 L2 T1 A1 C1 4 T2 T2 K1 C1 A2 T4 J1...
Страница 15: ...T2 B2 Paper sensor P1 V 1 T2 C2 Paper sensor Blower connector1 Blower connector2 P1 G3 T2 D2 Blower connector1 Blower connector2 Y10 2 T2 E2 P1 FG P2 FG Blower Earth Paper roller Earth T2 I2 Quick Co...
Страница 16: ...umber Connect Location P1 AC Y12 1 T2 J2 P1 IN T2 J2 P1 FG P1 FG P1 G3 T2 C2 Suction connector P1 G2 PLC COM T4 E1 PLC COM6 PLC COM4 P1 G1 T3 C2 PLC 0V P1 V 3 T3 D2 PLC 24V P1 V 2 Y6 3 Y12 3 Y10 1 Y7...
Страница 17: ...1 B1 C1 D1 A2 C2 B2 D2 Number Connect Location T3 A1 Heating Lamp Naught wire T3 B1 Heating Lamp Naught wire T3 C1 Aiifar 4c step_moto_V1 V T3 D1 Y5 3 Aiifar 4c step_moto_V1 V T3 A2 T2 J2 T3 B2 T2 I2...
Страница 18: ...4 I1 C1 5 L3 T4 J1 C1 A2 T4 K1 Y11 1 T4 L1 T2 J2 Number Connect T4 A2 Temperature control T4 B2 Temperature control T4 C2 Paper Feed Signal T4 D2 Paper Feeding V PotentiometerV T4 E2 Paper Feeding V T...
Страница 19: ...Rev 1 0 17 PLC Number Connect Location PLC COMO Not connect PLC Y4 Not connect PLC COM1 PLC COM2 PLC Y5 Y5 4 PLC COM2 PLC COM1 PLC Y6 Y6 4 PLC COM3 PLC COM4 PLC Y7 Y7 4 PLC COM4 PLC COM3 P1 G2...
Страница 20: ...Y17 4 PLC 24V P1 V 3 PLC 0V P1 G1 PLC COM Not connect PLC COM P1 G2 PLC XOO T4 C1 PLC X01 Not connect PLC X02 Not connect PLC X03 T2 A2 PLC X04 Not connect PLC X05 Not connect PLC X06 Not connect PLC...
Страница 21: ...elay Dehumidfication Y11 Connection Location Y7 1 P1 V 2 Y7 2 Suction connector Y7 3 Y10 3 Y7 4 PLC Y7 Connection Location DD Y10 1 P1 V 2 DD Y10 2 T2 D2 DD Y10 3 Y12 3 Y7 3 DD Y10 4 PLC Y10 Connectio...
Страница 22: ...Y14 Y11 1 T4 K1 Y11 2 DA Y10 1 Y11 3 Y13 3 Y16 3 Y11 4 PLC Y11 Connection Location Y17 1 T2 L2 Y17 2 Quick Connector Y17 3 Y16 3 Y6 3 Y17 4 PLC Y17 Connection Location Y13 1 Y16 1 Y13 2 Heating Lamp L...
Страница 23: ...INPUT 88 132VAC 3 0A 176 264VAC 1 5A OUTPUT 41V 3 0A 47 63HZ AC IN FG G V V Number Connect Location P2 V MD V P2 V MD GND P2 AC T2 K2 Connection Location Y14 1 Heating Lamp Live Wire Y14 2 T2 L2 Y14...
Страница 24: ...1 0 22 P2 IN T2 I2 P2 FG T2 E2 P2 G Not connect Microstep Drive MD Number Connect Location V P2 V GND P2 V ENA PLC Dedusting ENA DIR DIR PLC Dedusting DIR ENA PUL PUL PLC Dedusting PUL DIR PLC Dedust...
Страница 25: ...Rev 1 0 23 Microstep dirve PUL PUL DIR ENA GND V A A B B ENA DIR...
Страница 26: ...Rev 1 0 24 Quick Connector Number Connect Location A T4 I2 B Emergency switch C Number Connect Location C Rotary Switch B D T4 J2...
Страница 27: ...Rev 1 0 26 5 3 Positioning the unit 5 4 Electrical connections Cable 220v single phase 30 AMP The Azon Pronto Plus Shaker unit dimensions are 5 24 ft length 2 95 ft width 3 80 ft height...