Installation Guide 

of 

MSR2000 Wireless Mesh Routers

Содержание MSR2000

Страница 1: ...Installation Guide of MSR2000 Wireless Mesh Routers...

Страница 2: ...zalea logo and MSR2000 are trademarks of Azalea Networks All other trademarks and brand names are marks of their respective holders Notice This Guideline is applicable for outdoor version of Azalea MS...

Страница 3: ...Azalea MSR2000 Installation Guide Standards and Regulations Bureau of Radio Management of P R China Installation Guide Wireless Broadband Anywhere Anytime III...

Страница 4: ...y responsible to Congress The FCC was established by the Communications Act of 1934 and is charged with regulating interstate and international communications by radio television wire satellite and ca...

Страница 5: ...ed on or in connection with products certified by UL and under the terms of written agreement with UL C Tick Mark The Australian Communications Authority ACA and the Radio Spectrum Management Group RS...

Страница 6: ...VCCI requirements for RF emissions whereas Class B products only need to display a simple label European CE Mark The CE Mark is not a quality mark but rather a symbol that indicates conformity to the...

Страница 7: ...tions in this guide Please be sure there are no high voltage and electronic field Lightning Activity Warning Make sure not to connect or disconnect cables during periods of lightning activity A surge...

Страница 8: ...wer to the MSR2000 enclosure The requirement of grounding is to make sure the resistance must be less than 5 ohm between the ground termination point to grounding tier Power Installation Warning The i...

Страница 9: ...in Azalea standard package should be installed to outdoor MSR2000 The Azalea Warrantee policy does not cover those outdoor products which Solar shield is not installed for it Please contact Azalea tec...

Страница 10: ...y after the material acceptance signed Warranty Scope The operation of MSR2000 must follow the operation guides provided by Azalea networks Replacement Scope Replacement will be done for customer when...

Страница 11: ...e Survey 9 2 2 Site Survey Tools 9 2 3 The principle of site survey 10 2 4 Site Survey 10 1 1 4 Site location selection 10 1 1 5 Detail measurement of site survey 11 2 5 Tools Preparation for Installa...

Страница 12: ...1 9 Install MSR2000 on Pole 23 1 1 10 Install MSR2000 on Wall 24 1 1 11 Grounding of MSR2000 24 5 Installation of lightning protector 26 6 Installation of Feeder 27 7 Installation of Ethernet cable 29...

Страница 13: ...ea MSR2000 can help customers have application improvement adjustment and added value anywhere anytime and on demand with everything just easy efficient and economic The advantages of MSR2000 include...

Страница 14: ...ernet Cable Interface Console Cable interface Power cable interface Radio Port 1 Radio port 2 And there is grounding terminal for connection of grounding wire 1 3 Cables 1 1 1 Ethernet Interface 1 The...

Страница 15: ...e 5th pin of 9 pins ethernet water protection connector Orange 4th pin of 9 pins ethernet water protection connector White blue 2nd pin of 9 pins ethernet water protection connector Blue 3rd pin of 9...

Страница 16: ...t colors as white green green white orange orange white blue blue white brown brown connection method of ethernet cable with black connector is as Orange 1st pin of black connector White green 2nd pin...

Страница 17: ...reen 2nd pin of DB9 connector White Blue 5th pin of DB9 connector If the connector is crystal the connection is as 1 white orange 2 orange 3 white green 4 blue 5 white blue 6 green 7 white brown 8 bro...

Страница 18: ...ower connector with power cable is Red 2nd pin of 3 pin power cable with water protection Black or green 3rd pin of 3 pin power cable with water protection White or yellow 1st pin of 3 pin power cable...

Страница 19: ...h as site locations site hunting antenna height antenna azimuth antenna type antenna downtilt degree feeder length will be determined by site survey The modification of solution could be done due to t...

Страница 20: ...ea to have good quality Channel planning could help to avoid interference of narrow band 2 4 Site Survey Site survey mainly include site location selection and detail site informaton recording for sel...

Страница 21: ...ld conduct detail measurements according the plan the measurements and records include site location information antenna selection MSR2000 mounting position etc Site survey report is suugested to prep...

Страница 22: ...d be done the diameter is around 40 60mm Grounding is prepared already Check the distance between MSR2000 and Grounding point The cabling is mounted on wall or ceiling Special installation material or...

Страница 23: ......

Страница 24: ...imuth The main beam of antenna should point to the most dense traffic area to have better coverage and link quality The overlapping coverage between two neighboring site should be less than 10 of its...

Страница 25: ...rage area radio environment etc It should be done after site survey 3 1 Installation of directional antenna 1 1 6 Assembling of installation accessories Installation accessories of directional antenna...

Страница 26: ...ion of Antenna Tools Spanners 1 The height f antenna must follow the requirement in desgin documentation enough isolation should be secure between antennas vertical isolution is much better than horiz...

Страница 27: ...he difference less than 5 degree 5 Fix the down U bolt by screwdriver Adjusting down tilt angle 6 Measure the down tilt angle by angle inclinometer 7 Compare the difference between actual figure with...

Страница 28: ...of omni antenna includes Omni antenna Installation bracket of omni antenna 2 sets of fasten nuts included The procedure of omni antenna installation is 1 Mount the bracket to pole by one set of nuts f...

Страница 29: ...aloft work The installation should be done by experienced antenna installer Power line and high electronic field must be avoided Don t stand on side of antenna of MSR2000 when MSR2000 is operating th...

Страница 30: ...terial package of MSR2000 installation includes MSR2000 1 MSR2000 1 Solar shield 1 Installation Bracket 2 pipe holders mounted on pole 4 expansion bolts mounted on wall 9 set of nuts for solar shield...

Страница 31: ...panner The procedure of assembling bracket with solar shield is as 1 Connect bracket with solar shield by nuts 2 Fasten nuts by Spanner IF no solar shield the temperature would be very high by sunligh...

Страница 32: ...4 Put MSR2000 into solar shield 5 Connect MSR2000 with solar shield by nuts...

Страница 33: ...1 9 Install MSR2000 on Pole Tool Straight Screwdriver The procedure of installing MSR2000 on pole is MSR2000 1 Put pipe holder cross bracket 2 Mount MSR2000 on pole 3 Move MSR2000 to proper position 4...

Страница 34: ...the 4 mark positions 3 Hit expansion bolts into wall 4 Put MSR2000 on the expansion bolts 5 Fasten nuts by Spanner 1 1 11 Grounding of MSR2000 The grounding of MSR2000 is to protect MSR2000 not damag...

Страница 35: ...en the screw by Cross Screwdriver 5 Connect the another side of grounding wire with grounding bar 6 Daub butter on both side of grounding wire Grounding must not be skipped in the MSR2000 installation...

Страница 36: ...st high current by lightning Lighting protector should be installed between radio port and antenna feeders and be connected with lightning system of the building as well Lightning protector should be...

Страница 37: ...to copper ring and pressed well by Crimping Pliers 5 Connect the grounding copper ring with lightning protector and fasten it by Cross Screwdriver 6 Connect the another side of grounding wire with gro...

Страница 38: ...ocedure of feeder installation is as 1 Put feeder interface close to antenna connector very well and slightly fasten the connection by circling the feeder connector 2 Fasten the connector by Spanner 3...

Страница 39: ...hernet cable Ethernet cable connects MSR2000 mesh network to line network only gateway needs line connection The performance of network cable should be less than100 meters to secure the good performan...

Страница 40: ...ion of power cable MSR2000 use 110 220V AC as power the power interface is on the left and upper position of MSR2000 The cabling of antenna cable is introduced in chapter 2 3 The installation of power...

Страница 41: ...ng in the air 5 Another side of power cable connects air switch Installation of power cable must be done by experienced power cable installer and read the installation manual before installation Be su...

Страница 42: ...All parts of installed site are illustrated as below graph...

Страница 43: ...nsumption 7W Output power 100mw 20dBm Operating temperature 45 55 Storage temperature 50 85 Operating humidity 10 90 Wind Survivability 165mph Weather rating P67 Shock Vibration GB6587 4 86 2 MSR2000...

Страница 44: ...el 1 11 36 64 149 165 Europe Frequency 2 400 2 483GHz 5 15 5 35Ghz 5 47 5 725Ghz Channel 1 11 36 64 94 145 Japan Frequency 2 400 2 483GHz 4 90 5 091GHz 5 15 5 25GHz Channel 1 14 36 48 4 Modulation Mod...