Assembling Process
Step 1: Connect the bottom tube with base by screwing them together.
Step 2: Feed the Power Cord through the Base and the Bottom Tube,
and pull through around 1.8m of cable.
Step 3: Connect two middle tubes with bottom tube by screwing them
together.
Step 4: Connect the top tube with middle tube by screwing them together.
Step 5: Place the power cord plug through base, bottom pole, middle pole
and top pole. Connect the power cord plug to the socket in the heater
head.
Step 6: Push the Heater Head onto the Top Tube and fix in position using
the 4x8mm screws.
Step 7: Fix the power cord on the base by using Four M4 nuts.