background image

STEP 5:

 Install 4 pieces of connected tube on 

the top of the pre-assembled base(PART GG).
Screw the bolts at the bottom tightly.
(PART B 16PCS)

STEP 6:

 Open the flame screen carton, take out the flame 

screen (PART AA) to the top of the aluminium tubes using 
hardware provided (PART B 8PCS)

STEP 7: 

 

Take out 3 two sided bolts (Part A) out of 

screw pack, and connect to flame screen(Part AA). Attach
reflector(Part G) through the 3 bolts. Then tighten the 

shield with the 3 wing nuts. 

 

STEP 3: 

Mount the stabilty ring(PART H) to the 

base of the heater.

 

 

STEP 8: 

Open the glass tube box and take out the glass tube

(PART EE). Squeeze the stainless steel ring together(PART DD), 
and carefully slide the ring inside one end of the 
glass tube( PART EE).

 

STEP 4:

 Open the aluminium tube carton, take out 

all of the aluminium tubes (PART CC) Connect two 
tubes together. Screw the bolts in the middle position
tightly using the hardware provided (PART B 8PCS).

Содержание HLDS01-GTSS

Страница 1: ...ne or other flammable vapors and liquids in the vicinity of this appliance Close the valve of the gas cylinder or regulator Extinguish all naked flames do not operate any electrical appliances Check f...

Страница 2: ...1 888 775 1330 36 in 91 4cm and sides 24 in 60 9 cm 24 in 60 9cm 36 in 91 4cm...

Страница 3: ...TWO SIDED BOLTS WITH WING NUTS Please call us at 1 888 775 1330 English only for missing parts STABILITY RING ATTACH TO BASE H 1...

Страница 4: ...Please call us at 1 888 775 1330 English only for missing parts GG...

Страница 5: ...ame screen Part AA Attach reflector Part G through the 3 bolts Then tighten the shield with the 3 wing nuts STEP 3 Mount the stabilty ring PART H to the base of the heater STEP 8 Open the glass tube b...

Страница 6: ...Make sure two glass tubes are tightly connected After assembling the total length should be 49 5 in 125 7cm Avoid scratching the interior surfaces of tubes with the stainless steel ring while joining...

Страница 7: ...nutes 4 Push the igniter to generate spark while keeping control knob in depressed position 5 Check for pilot D C 6 B 4PCS STEP 9 Open the mesh guard carton take out mesh guard Part BB Hang the screen...

Страница 8: ...7 DO NOT store in a location that will exceed120 degrees F 48 8 Celsius...

Страница 9: ...E IN CHINA ITM ART 639564 PH08 SSB HLDS01 GTSS Input rate 40000BTU HR Gas Propane Gas supply pressure 25 to 250PSI 3 5 10 5Kg cm Manifold pressure 11 WC 2 74KPA INJECTOR SIZE 1 95mm 0 07 in 8 3177588...

Отзывы: