![axing CMTS 2-00 Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/axing/cmts-2-00/cmts-2-00_operation-instructions-manual_3036633026.webp)
Operation instructions | CMTS 2-00 | Cable Modem Termination System
6
2021-09-03 | Technical improvements, changes in design, printing- and other errors reserved.
1.2.
Scope of delivery
1 × CMTS 2-00 Cable Modem Termination System
1 × AC power cord
1 × Grounding cable
1 × Network cable
1 × Quick start guide
1.3.
Available Accessories
BZU 65-85 Diplexer 65/85 MHz
CZU 2-00
Additional power supply unit for CMTS 2-00
1.4.
Display elements and connectors
1.4.1. LEDs at front side
LED
Description
PWR A
On: The output of the power module A is normal.
Off: The output of power module A is not correct.
PWR B
On: The output of the power module B is normal.
Off: The output of power module B is not correct.
10 GE
On: The SFB cable is connected and a connection has been established
ALM
On (red): If an a failure has occurred
RUN
Green blinking: CMTS 2-00 initialization is complete.
Off: CMTS 2-00 initialization is not complete.
PWR
On: The power supply is normal.
Off: The power supply is of or voltage to low.
PWR A
PWR B
PWR
RUN
ALM
Reset
10 GE