
4
Step 4:
Connect the Front Bar (FB) to the projection Bars (P). Velcro will be facing out. Secure with Self tapping
screws.
Step 5:
Install the Cover Supports (NTC) with arrows pointing upward. Attach both ends to the (TB) and (FB).
Larger awnings add Cover support (NTC) and Wall Support (PM). Secure with self-tapping screws. Please keep in
mind wall supports (PM) won't have pre-drilled holes. You'll need to use the self tapping screws to secure the bars
to the rear end of the front bar where space is available.