Page
16
F
IGURE
14
-
D
EPLOYING THE
P
ROJECT
31. This causes the project to be compiled and deployed/activated. This step will take a while the first
time it is deployed but subsequent deployments are much quicker.
F
IGURE
15
-
P
ROJECT
D
EPLOYMENT IN
P
ROGRESS
32. Once
the “
Deploy
” step has completed, locate the unique
Base URL
address that has been
allocated, - this is visible in the
“
Endpoints
” panel (at bottom of the page).
Copy this Base URL via the Windows clipboard to a Windows Notebook window