Head Office
+61 (0)3 5977 6128
Avlite USA
+1 (603) 737 1311
Avlite Asia
+65 9119 8770
General Enquiries
Step 2: Adjustment of LED Floodlight Unit
AV-HL-FL-PV models: Determine to which group each
individual light belongs.
Set the light group by adjusting the Rotary Switch A on
the PCB to the appropriate light group (E.g. 0, 1, 2 etc).
AV-HL-FL-DC or UM Models: Wire the LED Floodlight
Unit into the daisy chain configuration via the junction
box. Follow the wiring instructions in section 7.0 of the
Installation Manual.
Step 3: Set the Light Group (PV Model Only)
or wire the Floodlight unit (DC and UM Mod
-
els Only)
AV-HL-FL-PV models: Determine to which group each
individual light belongs.
Set the light group by adjusting the Rotary Switch A on
the PCB to the appropriate light group (E.g. 0, 1, 2 etc).
AV-HL-FL-DC or UM Models: Wire the LED Floodlight
Unit into the daisy chain configuration via the junction
box. Follow the wiring instructions in section 7.0 of the
Installation Manual.
Step 4: Test and secure
AV-HL-FL-PV models: Test the operation of the light by
using the Radio Controller
Close the PCB enclosure and Solar Assembly. Secure the
lid with the provided bolt.
AV-HL-FL-DC and UM Models: Test the Operation of the
lighting circuits in the Helipad Lighting System using
the Primary Helipad Controller (AV-HL-CTRL-T1 or AV-
HL-CTRL-T2)
Bolt the light to its final location.
Junction Box (UM or DC)
Note:
Power and Data cables
can be wired into the junction
box from the left or right hand
side
Junction Box (UM or DC)
Note:
Power and Data cables
can be wired into the junction
box from the left or right hand
side
Internal wiring to Light
Head Assembly
Junction Box (UM or DC)
Note:
Power and Data cables
can be wired into the junction
box from the left or right hand
side
Internal wiring to Light
Head Assembly
PV Model
DC and UM Models
Alwa
y
s On
Dusk till Dawn