![Avlite AV-OL-70 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/avlite/av-ol-70/av-ol-70_installation-and-service-manual_3032726007.webp)
Latest products and information available at www.avlite.com
7
AV-OL-70 & AV-OL-70-HI
Solar Obstruction Light
Charging the Battery
New lights should be left in the sun for 1-2 days to ensure battery is charged before placing in
service. Please note, light will re-charge even when toggle switch is turned to ‘OFF’ position.
Preferred Installation Location
For best light performance, ensure solar modules are not covered and are in clear view of
the sky with no shadows.
Light Operation
Light is activated by ON/OFF Switch. Intensity and flash settings need to be set prior to installation.
1. Remove the marked flash adjustment bung from the base of the light and set internal toggle switch
to ‘ON’.
2. The power and range settings of the light are adjusted by setting the DIP switches inside the light.
Your light is normally set to maximum range (see
‘Selecting an Intensity/Power Setting’
section of
this manual).
3. Set rotary switches to the required flash code (see
‘Selecting a Flash Code’
section of this
manual).
4. Replace flash adjustment bung.
5. A sealed vent on the base allows air transfer without moisture intake, and should not be disturbed.
6. To test place dark cover (towel or jacket) on top of light to activate sensor, light will come on within
one minute.
7. Ensure that the unit is bolted to an even, flat surface.
4
5
6 7
8 9 A
B
C
D
EF0
12
3
4
5
6 7
8 9 A
B
C
D
EF0
12
3
A
B
1 2
ON
ON
Rotary
Switch B
Rotary
Switch A
Intensity Setting
FL
A
S
H
AD
JU
ST
M
E
N
T
SE
A
L
E
D
V
E
N
T
ON / OFF
Switch
User
Replaceable
Battery
Light
Base
Installation
Содержание AV-OL-70
Страница 1: ...Version 1 2 AV OL 70 AV OL 70 HI Solar Obstruction Light Installation Service Manual...
Страница 2: ......