AVK 57/46 Series Скачать руководство пользователя страница 4

AVK SEriES 57/46 & 57/86 rESiliEnt SEAtEd gAtE VAlVES

inStAllAtion, opErAtion & mAintEnAncE mAnuAl

 

2.  installation

• 

When installing the gate valves, ensure that the seats and the flange faces are clean.

• 

When valves are provided with lifting lugs, plates or eye nuts, these must be used to lift the valve.

• 

To ensure adequate sealing it is important to select the correct type of gasket for the medium concerned, gaskets with the 
correct flange size must be used.

• 

Place valve between pipe flanges, and insert the bolts.

• 

Tighten bolts loosely.

• 

Tighten bolts in a diagonal sequence to ensure flanges are pulled parallel.

• 

Finally tighten bolts to correct torque levels as recommended in WSA 109.

2.1.  Bolts

2.1.1  Bolt size

The following table shows bolt size you should use for which valve dimensions.

2.2.  gland Follower

Prior to pressurisation check gland follower nuts are finger tight. After pressurisation operate valve and check for weeping. Nip 
nuts (16) until weeping stops.

Note: If nuts are excessively tightened torque operation of the valve is increased dramatically.

3.  operation

Series 57/46 valves are suitable for use with clean water or neutral liquids up to 70°C. Minimum liquid temperature must 
be above freezing. Insulation is essential for external temperatures on 0°C to - 10°C. The valves are operated manually by 
handwheel.

 

 

AS 2129 

AS 2129

 

table B5 

table E 

table F

 

 

dn  Bolts Quantity 

Bolts Quantity 

Bolts Quantity

 

50 M16 4 

M16 4 

M16 4

 

80 M16 4 

M16 4 

M16 8

 

100 M16 4 

M16 8 

M16 8

 

150 M16 8 

M20 8 

M20 12

 

200 M16 8 

M20 8 

M20 12

 

225 

M16 

- - 

- -

 

250 M16  8 

M20 12 

M24 12

 

300 M20 12 

M24 12 

M24 16

 

375 M24 12 

M24 12 

M27 16

 

400 M24 12 

M24 12 

M27 20

AVK Valves Pty Ltd, 559A Grand Junction Road, Wingfield, SA 5013, Australia - T: +61 8 8368 0900 - E: [email protected] - W: www.avkcivil.com.au                                 Version number 3

COPYRIGHT©AVK GROUP A/S 2017 

                                                                                      pp. 4 of 6 

Содержание 57/46 Series

Страница 1: ...ained it is essential that the staff that undertake these operations be adequately trained The hazards of pressurised liquids and gases can be severe and it is the responsibility of the users to ensure that trained competent staff undertake these duties This manual has been designed to assist but it can never fully replace quality training in the workplace AVK technical staff will always be availa...

Страница 2: ...TE OPERATING TEMPERATURE PRESSURE MEDIUM AND OPERATING CONDITIONS WITH ENQUIRIES ORDERS SO THE MOST SUITABLE VALVE WILL BE SUPPLIED FOR YOUR SPECIFIC PURPOSE AVK Valves Pty Ltd 559A Grand Junction Road Wingfield SA 5013 Australia T 61 8 8368 0900 E enquiries avkau com au W www avkcivil com au Version number 3 COPYRIGHT AVK GROUP A S 2017 pp 2 of 6 Materials Castings gland flange body bonnet stem c...

Страница 3: ...nnet 10 Hot melt 11 Gland bushing 12 O ring 13 O ring 14 Washer 15 Gland 16 Hexagon nut 17 Gland follower 18 Yoke 19 Stud bolt 20 Washer 21 Handwheel 22 Stem nut 21 20 19 18 17 16 15 13 12 11 10 9 8 7 6 5 4 3 2 1 14 22 AVK Valves Pty Ltd 559A Grand Junction Road Wingfield SA 5013 Australia T 61 8 8368 0900 E enquiries avkau com au W www avkcivil com au Version number 3 COPYRIGHT AVK GROUP A S 2017...

Страница 4: ...o pressurisation check gland follower nuts are finger tight After pressurisation operate valve and check for weeping Nip nuts 16 until weeping stops Note If nuts are excessively tightened torque operation of the valve is increased dramatically 3 Operation Series 57 46 valves are suitable for use with clean water or neutral liquids up to 70 C Minimum liquid temperature must be above freezing Insula...

Страница 5: ... wedge 3 raised from the seat position f Lift gland follower 17 up and place washer 14 and nut 16 onto studs 19 to secure yoke 18 to bonnet 9 g Tighten nuts 16 that secure yoke 18 to bonnet 9 lower gland follower over studs 19 and place one washer 14 on top of each stud 19 h Place a small amount of Loctite 680 Threadlocker onto the nuts that secure the gland follower 17 i Place nuts onto studs and...

Страница 6: ...gn Rotate the splits at approximately 90 degree intervals c Reverse steps a and b for re assembly Repressurise the system At this time if there is a leak around the gland be sure that the upper gland follower yoke nuts are screwed down evenly on the stud bolts Tighten the nuts turn each until the leak stops Component list 1 Valve body 2 Wedge body 3 Wedge 4 Wedge nut 5 Pin 6 Stem 7 Bonnet bolt 8 B...

Отзывы: