Parts
Included
Hardware
Included in HW bag.
Tools Required
Not Included
Washer
x4
LAG
Shield
HEXBolt
Hardware Bag
Socket set
LAG Bolt
Toggle
Anchor
Legs
x3
CR2-WM
Credenza
Stud Finder
If Drywall
Drill
Drill bit set
Страница 1: ...CR2 WM Instructions www video furn com 288 Don Hillock Drive Aurora Ontario L4G 0G9 1 877 834 3876 Ver 1 0 ...
Страница 2: ...ed Hardware Included in HW bag Tools Required Not Included Washer x4 LAG Shield x4 HEX Bolt x4 Hardware Bag Socket set LAG Bolt x4 Toggle Anchor x4 Legs x3 CR2 WM Credenza Stud Finder If Drywall Drill Drill bit set ...
Страница 3: ... Baseboard trim May need to cut away Leave Clearance for door Drywall Stud wall Locate studs using stud finder and mark Approx 23 above floor height Follow Masonry step below to line up studs Place over an outlet If possible Masonry wall Place CR2 WM against wall at desired location And mark 4 hole locations through holes at Back of unit ...
Страница 4: ... 3 Continued Attach Fasteners to wall Drywall steel stud Wood Stud Masonry Assembly Instructions www video furn com 288 Don Hillock Drive Aurora Ontario L4G 0G9 1 877 834 3876 1 4 Drill 1 2 Drill Lag Shield ...
Страница 5: ...34 3876 Step 4 Install Equipment and Sound bar Shelf is Adjustable w pins Can be removed If Soundbar is Tall 3RU Per side Max depth 25 Step 5 Reinstall Panels Up to 4x 120mm Fans can be Added underneath Side doors For access to System On Off Finished Thanks for Purchasing AVFI Have a great day ...