
5
Marking Wall For Drill Points
Use the Wall Bracket (
A
) as a template and
position it on your wall. Ensure the bracket
is level and mark the three DRILL POINTS
with a pencil.
6
Planning & Preparation
Determine the wall type that you have (i.e. Brick/Stud/Plasterboard/Sheetrock).
Ensure the drilling area is free from mains services (Gas/Electric/Water).
Drill three 3mm diameter pilot holes to verify the wall type and select the appropriate fixings
(See Section 7).
Drill points.
A
*
C
Bottom Fixings
E
1, 2, 3
F
1, 5 ,9, 13
D
1
B
E
1, 2, 3
*
F
2, 6 ,10, 14
Top Fixings
*
C
Bottom Fixings
E
1, 2, 3
F
2, 6 ,10, 14
D
1
N
E
1, 2, 3
*
F
1, 5 ,9, 13
Top Fixings
Option 2
continued
Option 1
continued
If using screws
use Adapter (
E
1
)
(
F
1
) & (
F
2
)
If using screws (
F
5
) & (
F
6
) use Adapter (
E
2
)
If using screws (
F
9
) & (
F
10
) use Adapter (
E
3
)
If using screws (
F
13
) & (
F
14
) no Adapter required
*
TV must be parallel to wall. Use spacers / stand-offs as shown.