7
40
The mounting screws diameter should be
Ø
8 mm. In case of the cartboard-plaster walls installation, use cartboard-
plaster dedicated steel anchors with
Ø
8mm diameter screws.
Picture 5 Fixing screen wall brackets
Picture 6 Screen wall installation - phase 1
- Fix the ceiling brackets and the wall brackets with the screws supplied with the screen.
- Slide screen fixing bolts into the casette chanels (see Picture 6).
- Twist the screen casette and slide the chanel onto the ceiling brackets front hinge (see Picture 7).
- Twist the screen casette back to the horizontal position (see Picture 8).
- Slide locking bolts to the lock position (see Picture 8).
D = (3/4W+55)±W/6
W - screen width in milimeters
Check the screen case leveling before first unrolling the screen.
Do not use the screen if it is not properly installed (leveled).
Picture 7 Screen wall installation - phase 2
Picture 8 Screen wall installation - phase 3
3.4. Electric installation
- Lead out the power cables to:
a) the place of screen installation (screens with built-in remote control system),
b) the place of installation of the wall switch and between wall switch and screen (screenss without built--in control
systems).
- Screen power line should be fused with 1A fuse.
- Switch off the screen power line during installation work.
- Manual wall steering switch should be installed at the place meeting the following conditions:
a) installation150-180 cm above the floor level,
b) the screen should be visible by the wall switch operator during the screen operation,
c) wall switch operator cannot stay in reach of any of the screen’s moving parts during the screen operation .
d) the wall switch must be visible from the each part of the room irrespective of the screen position.
Содержание Cumulus X Tension
Страница 11: ......
Страница 12: ...Wersja D01 02 2017 ...