
test pms-link
Issue 4 May 2002
8-469
555-233-123
test pms-link
This command performs the specified property management system link tests on
the specified pms link by checking to see if the link is accessible and then
performing a reset on the link (long test only). For general information on PMS
links, refer to the description of the
command. For information
on what a PMS is and does, refer to the description of the
command.
Action/Object
Qualifier
Qualifier Description
Logins
Defaults
Feature
Interactions
test pms-link
short
long
repeat
number
clear
schedule
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test pms-link sh r 5
test pms-link l
test pms-link
test pms-link c
test pms-link c sch
1
If no alarms are registered against the maintenance object then the test sequence is run only once. The long
clear option forces a clear of all alarms if no errors are encountered during testing. The short clear option
only clears alarms pertinent to tests in the short sequence.
2
Refer to the Report Scheduler and System Printer feature specification for more details.
init
inads
craft
Test
Sequence
= short;
Repeat = 1
See below
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...