
Maintenance Object Repair Procedures
555-233-123
10-852
Issue 4 May 2002
Monitor download progress
1. Type status firmware download and press
Enter
.
The Status Firmware Download screen (
) displays.
Screen 10-8.
Status Firmware Download screen
2. If this form is blank after issuing the command, go to Step 4.
3. Check the
St
(status) field immediately to the right of the
Target
Location
field’s address of the circuit pack to view the progress of the
firmware update:
■
(P)ending
■
(C)ompleted
■
(F)ailed
■
(A)borted
4. Type status firmware download last and press
Enter
.
This allows you to view the progress of the last completed firmware update
or the entire schedule if it is completed.
!
CAUTION:
The ftplogin and ftppassword will remain on the TN799DP (C-LAN)
and TN2501AP (VAL) circuit packs until they are reset or until you
issue the disable filesystem board <UUCSS> command.
status firmware download Page 1 of 1
STATUS FIRMWARE DOWNLOAD
Source Board Location: 01C02
Firmware Image File Name: tn2501ap_f05.bin
Target Board Code: TN2501 Suffix: AP Firmware Vintage: _
Schedule Download? _ Remove Image File After Successful Download? _
Start Date/Time: 01/12/2001 13:30 Stop Date/Time: 01/14/2001 16:30
Target Target Target Target Target
Location St Location St Location St Location St Location St
1.01C02 P 11. _____ _ 21. _____ _ 31. _____ _ 41 _____ _
2. _____ _ 12. _____ _ 22. _____ _ 32. _____ _ 42 _____ _
3. _____ _ 13. _____ _ 23. _____ _ 33. _____ _ 43. _____ _
4. _____ _ 14. _____ _ 24. _____ _ 34. _____ _ 44. _____ _
5. _____ _ 15. _____ _ 25. _____ _ 35. _____ _ 45. _____ _
6. _____ _ 16. _____ _ 26. _____ _ 36. _____ _ 46. _____ _
7. _____ _ 17. _____ _ 27. _____ _ 37. _____ _ 47. _____ _
8. _____ _ 18. _____ _ 28. _____ _ 38. _____ _ 48. _____ _
9. _____ _ 19. _____ _ 29. _____ _ 39. _____ _ 49. _____ _
10. _____ _ 20. _____ _ 30. _____ _ 40. _____ _ 50. _____ _
Status: Pending(P) Completed(C) Failed(F) Aborted (A)
Содержание Definity SI
Страница 1: ...0DLQWHQDQFH IRU YD D 1 7 6HUYHU 6 Volumes 1 2 and 3 555 233 123 Issue 4 May 2002...
Страница 62: ...Maintenance Architecture 555 233 123 1 26 Issue 4 May 2002...
Страница 92: ...Management Terminals 555 233 123 3 26 Issue 4 May 2002...
Страница 204: ...Routine Maintenance Procedures 555 233 123 5 100 Issue 4 May 2002...
Страница 250: ...LED Interpretation 555 233 123 7 10 Issue 4 May 2002...
Страница 2763: ...VC DSPPT Issue 4 May 2002 10 1977 555 233 123 Figure 10 107 VC Circuit Pack DSP Port Local TDM Loopback Test...
Страница 2776: ...Maintenance Object Repair Procedures 555 233 123 10 1990 Issue 4 May 2002 Figure 10 109 VC Circuit Pack Summer Port Loopback Test...
Страница 2804: ...Maintenance Object Repair Procedures 555 233 123 10 2018 Issue 4 May 2002...
Страница 2968: ...Index 555 233 123 IN 10 Issue 4 May 2002...