User Manual
www.AvantcoEquipment.com 7
Typical Operation Sequence
ACTION
RESULT
Plug in your steamer
Power is connected; unit will begin to heat
Load product into steamer
Product is ready to steam
Press steam button for 2 seconds,
release, and wait 20 seconds
Unit fills body with steam, which penetrates the product
Unload steamer
Product will be hot; use caution removing it
Cleaning & Maintaining Your Steamer
Daily cleaning is recommended for maximum service life. Do not immerse steamer in water or other liquid; it may cause
the electrical components to short circuit or to produce an electrical shock.
Daily Maintenance
1. Flip on/off switch to the ‘off’ position. Disconnect power cord from electrical outlet.
2. Let steamer cool for 45 minutes.
3. Use a sponge or damp cloth and hot soapy water to wipe down unit.
4. Rinse with clean, damp cloth.
5. Wipe dry.
Monthly Maintenance
1. Flip on/off switch to the ‘off’ position. Disconnect power cord from electrical outlet.
2. Let steamer cool for 45 minutes.
3. Clean unit by following steps 3 – 5 above.
4. Lift loose end of spray tube and pull it out of the generator hole.
5. Slide off metal spray tube cover. Using a paper clip, poke out the holes in the tube.
6. Wash away the loose deposits by gently washing the tube under running water. Slide metal cover back onto tube.
Do not bend spray tube.
7. Scrape off excessive calcium/mineral build-up from generator surface.
8. Wipe generator with a damp cloth, and remove loose build-up. Reassemble unit.
9. See “Water Tank Filter Maintenance” section below for additional maintenance instructions.