background image

PAGE 3

Help: 888-426-5001

QualityWaterForLess.com

    ›ta B l e   o F   C o n t e n t s

Page 2 

Meter Control Valve Ports and Programming Reference 

(Click to Jump to Page)

Page 3 

Table of Contents

Page 4 

Calculating your Hardness Level, and Salt Grid Table

Page 5 

Tank Size, Salt Setting, and Salt Grid Table

Page 6 

Pre-Installation and Tank Placement

Page 7 

Filling the Tank and Installing the Autotrol 255/760 Valve onto the Tank

Page 8 

Installing the Bypass and Drain Line onto the Valve

Page 9 

Plumbing the System into your Home and Making the Brine Tank Connection

›PR e FaC e

Thank you for your purchase of a new water softener with Autotrol 255/760 Meter Control Valve from 
QualityWaterForLess.com! We have put together these instructions as reference and to be used as gen-
eral installation guidelines. 

It is always recommended that a licensed plumber perform all installa-

tion work according to all local codes.

 We at QualityWaterForLess.com cannot assume responsibili-

ty for improper installation, application, or injury or damage as a result of improper installation.

Page 11 

Programming the Autotrol 255/760 Valve

Page 13 

Initial System Start-Up

Содержание 255/760

Страница 1: ...v1 0 AUTOTROL 255 760 Metered Water Softener Install ation Guide...

Страница 2: ...ming When you first plug in your unit the control will require you to enter the adjacent values Use the UP DOWN buttons to cycle through the settings use the SQUARE SET button to enter edit mode use t...

Страница 3: ...lve Page 9 Plumbing the System into your Home and Making the Brine Tank Connection Preface Thank you for your purchase of a new water softener with Autotrol 255 760 Meter Control Valve from QualityWat...

Страница 4: ...er by 17 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 Compensated Hardness Your Iron results should also be measured in either PPM or mg L Take you...

Страница 5: ...x33 Grid 18x40 Grid 24x41 Grid 24x50 Grid 24K 0 75 cu ft 8x44 0 10 gpg Low 2 25 lbs NO GRID NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 10 20 gpg Standard 6 75 lbs Grid Grid NO GRID NO GRID 20 gpg Hig...

Страница 6: ...Fig u r e 6 a Fig u r e 6 b pre install ation Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concr...

Страница 7: ...r d fi n e m es h 3 Installing the Autotrol 255 760 Valve 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lubri cate the inner and outer o rings on the bot...

Страница 8: ...ow 8 Secure each plumbing adaptor onto the bypass as shown in Figure 8 F i If you are using copper connections first prefabricate and sweat a 12 tube section onto each adaptor and cool BEFORE assembly...

Страница 9: ...ording to all local plumbing codes If using copper pipe please pre fabricate at least a 12 section of pipe for the IN and OUT bound lines and use a wet rag on the lines being soldered to prevent heat...

Страница 10: ...e tube and insert the tube through the small hole drilled through the brine tank and brine well Loosely un screw the hex nut on the 2310 Brine Float Assem bly Insert the tubing end firmly into the hex...

Страница 11: ...UP or DOWN buttons to change to the current time of day i Note that there is a difference between AM and PM Then press the SET button to make this setting active Figure 11 E 6 Next is the Day of the W...

Страница 12: ...ess the SET button to begin editing choose L for 0 10 gpg S for 10 20 gpg and H for 20 gpg Use the UP or DOWN buttons to make the appropriate chang es to the salt setting and press the SET button to m...

Страница 13: ...lons of water the amount of water needed to cover the brine grid into the brine tank Start the regeneration sequence by HOLDING the REGEN button for 5 seconds Once the hourglass symbol disappears let...

Отзывы: