Module Installation

WARNING:

 

Do not add or remove modules with field power applied.

Step One:

 

With latch 

in “locked” position, align 

connectors on the side of 

each  module  and  stack 

by  pressing  together. 

Click  indicates  lock  is 

engaged.

Step Three:

 

To unstack modules, pull 

locking latch up into the unlocked position 

and then pull modules apart.

Step Two:

 

Attach field wiring using 

the removable terminal block or 

ZIP

Link 

wiring system.

LO

C

K

U

N

LO

C

K

Check all latches are 

secure after modules 

are connected.

WIRE STRIP

LENGTH

MIN

MAX

M

WARNING:

 

To minimize the risk of potential safety problems, you should 

follow all applicable local and national codes that regulate the installation 

and operation of your equipment. These codes vary from area to area and 

it is your responsibility to determine which codes should be followed, and 

to verify that the equipment, installation, and operation are in compliance 

with the latest revision of these codes.

Equipment damage or serious injury to personnel can result from 

the failure to follow all applicable codes and standards. We do not 

guarantee the products described in this publication are suitable for 

your particular application, nor do we assume any responsibility for your 

product design, installation, or operation.

This device is not intended for personnel, product, or machine 

safety applications.

This publication is based on information that was available at the time 

it was printed. At AutomationDirect.com

®

 we constantly strive to improve 

our products and services, so we reserve the right to make changes to 

the products and/or publications at any time without notice and without 

any obligation. This publication may also discuss features that may not be 

available in certain revisions of the product.

Power Requirements

Base Controller and I/O 

Power Requirement¹

24VDC ±2% 1.25 W per I/O module
@ 0.5 W for SAMD and Base Controller
@ 9W for max header power draw²

Recommended Fuse 

(External)

Edison S506-R, Time Delay, 1A Fuse
For 9–15 modules: Edison S506-R, Time Delay, 2A Fuse

1. If you do not use a Productivity1000 power supply, like the P1-01AC, then use a power supply 

that has a transformer isolation. Use different 24VDC supplies for the CPU and inductive loads to 

keep the CPU power clean and free of voltage spikes caused by switching solenoids, motors and 

relay coils.
2. See Header Power Limitations in P1AM User Manual in QR code link to additional resources.