5
Sales 800-633-0405
www.productivity2000.com
Wiring Options
1
ZIP
Link Feed Through Modules and Cables¹
ZIPLink pre-wired
terminal block cables
0.5m (1.6FT) cable
1.0m (3.3FT) cable
2.0m (6.6FT) cable
ZIPLink Modules
ZL-P2-CBL24
ZL-P2-CBL24-1
ZL-P2-CBL24-2
ZL-RTB20
ZL-RTB20-1
2
Terminal Block with pigtail cable
1.0m (3.3FT) cable
2.0m (6.6FT) cable
ZL-P2-CBL24-1P
ZL-P2-CBL24-2P
3
Accessories²
ZL-RTB-COM
TW-SD-SL-1
TW-SD-MSL-1
Module Configuration
Using the Hardware Configuration tool in the
Productivity Suite programming software, drag
and drop the P2-16ADL-1 module into the base
configuration.
Select
Automatic Module Verification
or
No
Verification and Enable Hot Swap
. If desired,
assign a User Tagname to each input point
(channel) selected and to each
Status Bit Item
.
13
ZL-RTB20
ZL-RTB20-1
1. Cable +
ZIP
Link Module = Complete System
2. ZL-RTB-COM provides a common connection point for power or ground