Automationdirect.com Productivity 1000 P1-08NE3 Скачать руководство пользователя страница 3

3

Sales 800-633-0405

www.productivity1000.com

Wiring Options

 

1

ZIPLink Feed Through Modules and Cables¹

0.5 m (1.6 ft) cable

1.0 m (3.3 ft) cable

2.0 m (6.6 ft) cable

ZL-RTB20
ZL-RTB20-1

ZL-P1-CBL10
ZL-P1-CBL10-1
ZL-P1-CBL10-2

       Terminal Block with pigtail cable

1.0 m (3.3 ft) cable

2.0 m (6.6 ft) cable

ZL-P1-CBL10-1P

ZL-P1-CBL10-2P

3

Screw Terminal Block only

P1-10RTB
(Quantity 1)

4

Spring Clamp Terminal Block only

P1-10RTB-1
(Quantity 1)

5

 

Accessories²

ZL-RTB-COM

TW-SD-SL-1

TW-SD-MSL-2

ZL-RTB20

ZL-RTB20-1

2

1.Cable + 

ZIP

Link Module = Complete System

2. ZL-RTB-COM provides a common connection point for power or ground

= Complete System

ti

i t f

P1-08NE3 Schematic and Wiring Diagram

INPUT 

COM 

Internal Module Circuitry 

Optical Isolator 

24 VDC

+

Equivalent Input Circuit  

24VAC

24 VDC

+

+

24 VAC

C1

1
2
3
4

C2

5
6
7
8

123456789

10

24 VDC

+

+

24 VAC

Отзывы: