Automation Direct Productivity2000 P2-08ND3-1 Скачать руководство пользователя страница 2

 

www.productivity2000.com  

Tech Support 770-844-4200

 

Sales 800-633-0405 

www.productivity2000.com 

2

Wiring Options

 

1

ZIP

Link Connection System 

Cable + 

ZIP

Link Module = Complete System

ZIP

Link pre-wired  

terminal block cables

0.5 m (1.6 ft) cable

1.0 m (3.3 ft) cable

2.0 m (6.6 ft) cable

ZIP

Link Modules

Feed through 

ZL-P2-CBL18

ZL-P2-CBL18-1

ZL-P2-CBL18-2

ZL-RTB20
ZL-RTB20-1

 

2

Terminal Block with pigtail cable

1.0 m (3.3 ft) cable

2.0 m (6.6 ft) cable

ZL-P2-CBL18-1P

ZL-P2-CBL18-2P

3

Screw Terminal Block only

P2-RTB

(Quantity 1)

4

Spring Clamp Terminal Block only

P2-RTB-1

(Quantity 1)

ZL-RTB20

Align

with slot

2

 rotate

to seated

position

Module Installation

WARNING:

 

Do not apply field power until 

the following steps are completed. See 

hot-swapping procedure for  

exceptions.

WIRE STRIP

LENGTH

WIRE STRIP

LENGTH

Step One: 

Align module 

catch with base slot and 

rotate module into  

connector.

Locked

Unlocked

Step Two: 

Pull top locking 

tab toward module face. Click 

indicates lock is  

engaged.

Step Three: 

Attach field wiring using the removable 

terminal block or 

ZIP

Link wiring  

system.

ZL-RTB20-1

Отзывы: