![Automation Direct Productivity2000 P2-08ND3-1 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/automation-direct/productivity2000-p2-08nd3-1/productivity2000-p2-08nd3-1_manual_3021739002.webp)
www.productivity2000.com
Tech Support 770-844-4200
Sales 800-633-0405
www.productivity2000.com
2
Wiring Options
1
ZIP
Link Connection System
Cable +
ZIP
Link Module = Complete System
ZIP
Link pre-wired
terminal block cables
0.5 m (1.6 ft) cable
1.0 m (3.3 ft) cable
2.0 m (6.6 ft) cable
ZIP
Link Modules
Feed through
ZL-P2-CBL18
ZL-P2-CBL18-1
ZL-P2-CBL18-2
ZL-RTB20
ZL-RTB20-1
2
Terminal Block with pigtail cable
1.0 m (3.3 ft) cable
2.0 m (6.6 ft) cable
ZL-P2-CBL18-1P
ZL-P2-CBL18-2P
3
Screw Terminal Block only
P2-RTB
(Quantity 1)
4
Spring Clamp Terminal Block only
P2-RTB-1
(Quantity 1)
ZL-RTB20
1
Align
with slot
2
rotate
to seated
position
Module Installation
WARNING:
Do not apply field power until
the following steps are completed. See
hot-swapping procedure for
exceptions.
WIRE STRIP
LENGTH
WIRE STRIP
LENGTH
Step One:
Align module
catch with base slot and
rotate module into
connector.
Locked
Unlocked
Step Two:
Pull top locking
tab toward module face. Click
indicates lock is
engaged.
Step Three:
Attach field wiring using the removable
terminal block or
ZIP
Link wiring
system.
ZL-RTB20-1