Roll Up Door Opener Set Up
GDO-8 EasyRoller
®
Insert the Solar Panel’s Wires
a. Unplug the drive unit from mains power.
b. Remove the controls cover and chassis enclosure, then remove the transformer and EMC board.
c. Remove the mains power cable, then fit a nylon gland
13
to its hole in the chassis. Feed the
Solar Panel’s
1
cable through this gland.
d. Fill the transformer’s screw hole by using the rubber washer
16
, metal washer
15
and M6x10 screw
14
.
WARNING!
Do not connect the batteries until you have connected wiring on the charger board.
IMPORTANT
WARNING!
Do not connect battery
or solar panel polarity
incorrectly - this will
result in serious damage
to components.
Mount the Battery Box
a. Drill a 12.5mm hole in the chassis enclosure as shown above.
b. Fit a nylon gland 13 to this hole.
a. Drill a 16.0mm hole in the Battery Pack enclosure (recommend at the bottom) and fit nylon gland
9
.
b. Mount the Battery Pack
2
using the mounting lugs
6
and screws
7
close to the opener.
c. Feed the 2-core 18AWG gauge cable
8
through the Battery Box’s nylon gland
9
and the nylon gland
13
in the
openers chassis.
d. DO NOT CONNECT THE WIRES to the Charger Board or battery terminals.
WARNING!
The opener will become active during the following steps.
Mount & Wire the Charger Board
a. Secure the adhesive mounts
17
to the Charger Board with cable ties
18
. Affix the Charger Board
3
inside the
chassis enclosure above the 12.5mm drilled hole.
b. Unscrew and remove the three-wire harness from the Charger Board. Replace with the two-wire (red/yellow) harness
12
, connecting wires as shown.
c. Plug the two wire (red/yellow) harness
12
into the control board’s “24vac supply” connector.
d. Connect the
red wire
to the Charger Board’s “SOLAR+” connector, and the
black wire
to the “–SOLAR”
connector.
e. Connect the 2 core cable to the battery by; connecting the
red wire
to the Battery Box’s “+” terminal, and the
black wire
to the “–” terminal.
f. Refit covers and chassis enclosures to the opener.
Setup and Test the Opener
a. Setup travel limits and code transmitters as per the GDO-8 instruction manual.
b. Press either the Operate button on the opener or use a programmed transmitter to test the opener.