
10
components
7.
Vend Motors.
The Snackshop LCM incorporates the use of
a high RPM DC motor. Due to new design, the vend motor
may no longer be homed by hand.
DO NOT TRY TO TURN
THE SPIRALS BY HAND. DAMAGE TO THE MOTOR
WILL RESULT.
It is also important to check polarity before
applying current to the motor. 2 diodes and a capacitor are
used to prevent circuit feedback and may have to be
checked when trouble shooting motor problems .
8.
Lighting System.
There is only 1 flourescent lamp in the
Snackshop LCM. The lamp is located on the top, inside of
the door which lights up the main product area.The starter
is located on the hinge side of the lamp. The ballast and line
filter is located on the top, front, left shelf support.
(Page 18,
Item 16.)
9.
Main Product Shelves.
There are 3 to 6 main product
shelves per machine. Each containing either 4 or 8
selections. Each selection has its own motor mounted to
the back of the shelf. Every shelf has its own harness and
plug for connecting to the remainder of the circuit through
the cabinet receptacle, located in the right, rear of the
cabinet. The motors are the same on either type shelf. It is
now possible in the Snackshop LCM to exchange a 4-
selection shelf with a 8-selection shelf or vice versa. You
also have the capability to gain 1/2" either up or down on
any shelf. To do this, the shelf should be removed and the
cabinet back harness receptacle lowered or raised with the
right and left shelf tracks.
Removing Product Shelf.
a. Lift up and push the lock levers toward
the back of cabinet.
(Figure 1., Page 4.)
b. Pull shelf to its loading position.
c. Grasp shelf in front and rear center. Lift
front of shelf up above horizontal and pull shelf forward
while lifting.
d. To install shelf, reverse above procedure.
10.
Delivery Bin.
This is located below the display window on
the door and is mechanically operated. The linkage on the
outside end of the delivery bin may require occasionally
lubrication. Should the door become difficult to operate,
place a small amount of grease on the arm tra ck s.
Removing Delivery Bin.
a. Remove the screws from the underside
of the delivery bin. These screws fasten
into the lower door brace and
remove the screws and brackets at the
top of the delivery bin.
b. Grasp delivery bin on both sides, lift up and pull back.
Should bin be tight, rock it by lifting on one end, then the
other.
Replacing Delivery Bin.
a. Locate lip on front edge of delivery bin, over lower edge
of opening in door and behind trim.Press down along lip
to make sure it is fully engaged between door and trim.
b. Install the 4 screws and 2 brackets, to secure bin to
door.
11.
Coin Return.
The coin return lever is located on the door
and the coin return linkage is located above the
changer, scavenges the slug rejector. Actuation of the coin
return lever, will clear the rejector of any damaged coin and
will also cancel all credit on the changer, returning that
amount to the customer.
12. Coin Acceptance.
A coin or coins (5¢, 10¢ or 25¢) being
deposited, passes thru the rejecter and into their respec-
tive coin paths in the changer, establishing the credit. The
coins then enter either the self-load change tubes on the
changer or the cash box. Actuation of the coin return lever
prior to making a selection will cancel all credit on the
changer and will return the amount of deposit back to the
customer.
13. Removing Gum & Mint Motor and/or Ejectors.
Disconnect the 2 wires going to the motor and remove the
4 screws holding it to the shelf. The components attached
to the front base can also be replaced. These consist of
the gum & mint shelf front (price tabs and selection), gum
& mint shelf front base, gum & mint display front stop
(plastic) and the gum & mint ejector.
14. Chilled Air Machine.
When placing a chilled machine at a
location
CAUTION
should be taken to keep adequate
clearance in the rear and front bottom screens for proper
circulation.The front vent screen assembly
(Page 30, Item
6 )
should be removed and cleaned periodically for
proper operation of the refrigeration system.
NOTE: Important! Please install the air deflector
(page
31, Item 15)
which comes with each chilled machine.
NOTE:The cold control setting
(Page 34, Item 7)
should be set on the #4 position.
NOTE: Before replacing the gum & mint motor, it would
be helpful to tap the motor first with the screws.
Assemble the 4 components together and mount them
to the motor, making sure that the head crank of the
motor is inserted into the ejector. Replace the 4 screws
and test vend that selection for proper operation.
Содержание SNACKSHOP LCM1 Series
Страница 16: ...12 door outside front 14 ...
Страница 18: ...14 door inside front 25 20 64 53 38 32 54 30 65 ...
Страница 20: ...16 cabinet ...
Страница 22: ...18 cabinet ...
Страница 24: ...20 snack shelf ...
Страница 26: ...22 convertible shelf 5 ...
Страница 28: ...24 candy shelf ...
Страница 30: ...26 gum mint shelf 10 11 ...
Страница 32: ...delivery bin 28 ...
Страница 34: ...chill machine supplement 30 6 13 2 2 9 10 15 14 12 1 2 4 5 17 See Page 32 ...
Страница 36: ...chill machine supplement 32 20 14 21 18 25 16 15 3 10 6 7 12 5 13 4 19 17 1 27 2 11 8 9 26 22 ...
Страница 44: ...40 connectors ...
Страница 49: ...45 ...
Страница 50: ......
Страница 51: ...46 ...
Страница 52: ......