42
Instructions for the installer
- Cascade Manager
- System Monitor
eBUS
Modbus
- System Manager
- System Supervisor
Modbus
0
1
2 3 4
5
6
78
9
BCM
(Pos 1÷7)
SLAVE 1
0
1
2 3 4
5
6
78
9
BCM
(Pos 0)
SLAVE 2
0
1
2 3 4
5
6
78
9
BCM
(Pos 1)
BCM board
PLC/BMS board
eBUS
Modbus
- System Manager
- System Supervisor
Scheda PLC/BMS
Modbus
- Cascade Manager
- System Monitor
- System Manager
- System Supervisor
Scheda BCM
1
2
3
Y2
4
5
6
7
Y3
1
2
3
Jp1
1
2
3
Y4
4
DL
1
D
L
2
DL
3
1
23
Y1
45
6
A1
SW
1
eBUS remoto
B
CM
eBUS -
eBUS +
+ 24 V
eBUS remoto
BCM (modulex 2)
Y2 (3-4)
Connection for boilers in a cascade arrangement connected to an external BCM optional and managed by
PLC/BMS (E8 disconnected).
The applications in a cascade arrangement
managed with an additional BCM require the
correct boiler address setting (within the
cascade formation) via the BCM’s internal
SWI selector: 0....7,
all different and in
sequence, (exactly as requested by the single
burner modules).
Switch ‘’C’’ (see pag. 47)
in Position 0
(for each boilers)
In this configuration,
switch ‚‘‘C‘‘ must be
positionned on 0.
- E8 not wired to the BUS -
I
=
BCM in series
II
=
Forniture Position