4. INSTALLATION
4.1 UNPACKING
AND
INSPECTING
Once the units have been received, examine the packaging for signs of
damage. This type of packing is reusable for these compressors.
Unpack the equipment and verify that no damage has occurred in
transit. Check the tip and tell devices and the pressure gauges for
signs of mishap during transit. The tip and tell device should insure
that the unit has not been transported at an angle greater than 45° and
the pressure gauges should read 240psi±10%.
The unit comes with a removable castor frame. We have the option to
install feet, castors or rails, depending on the customer requirement.
If damage is detected contact the carrier and Austin Scientific as soon
as possible.
4.2 MOUNTING
4.2.1 MAX OPERATING ANGLE
The compressor unit can be installed and operate with a
maximum tilt of 10° in any direction.
4.2.2 FLEXLINES and CONNECTORS
The lines and connectors have been equipped with self-sealing
coupling, this maintains the positive seal so no helium can
escape during any maintenance.
These couplings should never see oil or grease and before any
installation check all connections for foreign material and clean
if necessary. Verify that all flat seals on the male connectors
are in good condition and replace if necessary.
Work with the flex lines only if the compressor switch is in the
off position and the internal pressure is below 400psi.
Never twist the flex lines.
Tighten down coupling as far as possible and then back it off by
¼ of a turn.
Содержание M600
Страница 4: ...Flow diagram of the compressor system ...