
ONT-2-E4xxxi Multi-service Residential Gateway Series Hardware Installation Guide
24
UNRELEASED DRAFT
TM 87-10879 Rev. A
Figure 6 Schematic of the Back of the Fiber Tray
4.
Select 2 screws or nails (with heads appropriately sized to snugly fit the keyhole slots), and insert them
into the wall so that they align with the keyhole slots. Ensure that the screw/nails are horizontally level.
5.
When the screws are in place and the fiber tray is ready to be mounted, hold the fiber tray so that its
keyhole slots are positioned directly over the screw heads, push it back towards the wall, and then slide it
downward until it is firmly seated in place.
Snap the fiber tray cover over the fiber tray. You can wire the optical fiber cable any time. See Figure 7
for a picture of a fiber tray that has been mounted on a wall, in preparation for a provisioned EPON
Multi-service Gateway. Remove the fiber tray cover and deftly snap the ONT onto the tray.
Figure 7 Fiber Tray with Cover Installed on Wall
6.
When the EPON Multi-service Gateway ONT has been provisioned for service, you can place the ONT
onto the fiber tray by holding the ONT with the Aurora Networks logo on top and snapping the ONT
onto the fiber tray.