7
4.
OPERATION
START UP & USE
4.1
Fill tank with chemical solution at the correct dilution (check with
chemical supplier)
4.2
Ensure on/off valve at hose end is turned off.
4.3
Connect compressed air supply to air inlet (max 7 bar)
4.4
Turn ‘dry/wet’ control fully clock wise.
4.5
Open valve at hose end and wait for fluid to emerge.
4.6
Turn ‘dry/wet’ control anti-clockwise until desired foam quality is reached
.
CLOSE DOWN
4.7
Close on off valve at end of hose
4.8
Turn off air supply to machine
4.9
Slowly open on off valve to release pressure in hose.
4.10
At least once daily flush the pump through with clean water by putting
5L clean water in to the tank at 4.1, and following instructions 4.1 - 4. 5, then
close down 4.7 - 4.9.
EVERY DAY
5.1
Flush the pump through with clean water as at 4.10
5.2
Physically check the tank, hose, connections and valves before each use to
detect any damaged parts, and replace as necessary.
5.
MAINTENANCE
Содержание Technifoamer 110
Страница 1: ......
Страница 5: ...3 SPARE PARTS 5 ...