background image

Recommended Additional Installation Materials

• Power Drill

• Tape measure

• Carpenters Level

• Small ladder 

(depending on ceiling height)

• Nail Set

• 

Hammer

• Pencil

• 32 2.5” 4D finish nails

• Straight Edge

• 256 .75”-1” drywall screws

Elite Pro System EPS-168T General Information

B22 ProPanel Installation Guide

Install four impaling clips within marked 

B22 

ProPanel location using drywall screws. 
Exact placement of each clip is not necessary.

Mark intended location of each 

B22 

ProPanel on the wall or ceiling.

Marked panel
outline

Start the 

B22 ProPanel 5/8” above its intended 

final height and press downward at a 45° angle 
until the panel is flush with the wall surface.

TIP 

For permanent mounting, apply Tubetak Pro 
adhesive to the back of the B22 ProPanel 
before completing Step 3.

CAUTION 

Always use Tubetak Pro on the back of the 
panel when attaching it to the ceiling.

Содержание Elite Pro Systems EPS-168T

Страница 1: ...by utilizing products covered with specialized acoustical fabrics The EPS 168T system contains B22 ProPanels CT45 Bass Traps and ProFusors which when used together provide incredibly effective acoustical control in any room Use the EPS 168T alone for treatment of small to medium sized rooms or in combination with other Auralex products for full control of larger spaces B22 ProPanels 20 Impaling Cl...

Страница 2: ...in marked B22 ProPanel location using drywall screws Exact placement of each clip is not necessary Mark intended location of each B22 ProPanel on the wall or ceiling Marked panel outline Start the B22 ProPanel 5 8 above its intended final height and press downward at a 45 angle until the panel is flush with the wall surface TIP For permanent mounting apply Tubetak Pro adhesive to the back of the B...

Страница 3: ... nail is installed perpendicular to the wall surface Repeat in each of the four corners Using a nail set or other finish nail carefully countersink installed nail so its head goes through the fabric surface of the CT45 but not through the hardened edge Once finish nail has been countersunk into the panel there may be a small hole remaining in the fabric covering Simply scrape the fabric in this ar...

Страница 4: ...tline mark another rectangle 4 in from both sides 5 25 down from the top and 2 75 up from the bottom Install one Z Clip in each corner of the marked inner rectangle using drywall screws as shown Hold the ProFusor to the wall or ceiling in its intended location with the back facing out Make sure diffusor is level Completely trace its outline 4 5 25 2 75 4 Marked inner rectangle Traced ProFusor Outl...

Отзывы: