Aura ASR1203-OO Скачать руководство пользователя страница 4

Installation Manual

ASR1203-OO *** Valve Rough-In

Dimensions of fixtures are approximate and may vary ± 6mm (1/4”). Structure measurements must be verified against the unit to ensure proper fit.

Product images and specifications are for illustrative purposes only, product design may vary.

4

Removing Plastic Covers:

 

Remove the protective 

Protective Cover (1) and (2)

 by 

rotating the to the left and pulling outwards.

Open the Stops:

 

Using a screwdriver, completely open the  stops to 

maximum opening.

Be sure to not over tighten or loosen the stops as it may 

cause the stops to break. 

(See Figure D1. on the left)

Install Wallboards and Tiles:

 

After finishing installation of wallboards and tiles, silicone 

around valve box. Silicone to create a seal. 

Ensure it is silicone where wall and valve box meet. 

2A.

2B.

1

2

2A.

2B.

Thermostatic Valve Cover Plate and Handle Installation

HOT

Open

Open

UP

COLD

UP

D1.

CAUTION! 

Do not over open when the stops reach 

the maximum opening, as it may cause 

the stop to malfunction.

Thermostatic Valve Installation

HOT

C

H

Open

Open

UP

COLD

UP

1B.

1C.

1D.

1

7

8

9

10

11

12

2

3

4

6

5

1E.

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)

Thermostatic Mixer Handle

Cap

Handle set Screw

Volume Control Handle

Plastic Washer

Volume Control Escutcheon

Plastic Washer

Cap

Handle Set Screw

Allen Key

Thermo Escutcheon

Trim

X

X

Diagram 1 

ATTENTION! 

Please check the thickness, making 

sure the plastic surface does not go 

beyond the tile surface.

ATTENTION! 

REMOVE THE CARTRIDGE BEFORE INSTALLATION.
FLUSH THE HOT AND COLD SUPPLY LINES WITHOUT THE 

CARTRIDGE AFTER INSTALLATION. (SEE PAGE 9)

Insert the Valve to the Wall: 

(EXAMPLE DIAGRAM 1)

  

Install the valve so that the outside surface of the finished 

wall falls between 57.15mm to 69.85mm (2 ¼" to 2 ¾") 

from the back of the valve.
Please check the installation to ensure the plastic surface 

on the valve does not go beyond the finished tile surface. 

Using a level, adjust the two main points to level, then 

install the valve.

 

Connect the Water Pipe:

Attach 

HOT (Left)

 and 

COLD (Right)

 water supply lines to 

the thermostatic valve. 
Attach water supply line from the outlet to desired shower 

components.

Water Sealing Test:

Close the stops with a screwdriver by rotating the stop. 
Open the main water pipe line to test the waterway 

sealing. If the sealing on water line leaks, fix it then move 

on to next step.

Trim/Handle Installation Preparation:

Be sure to check you have these parts before you move 

on to the next step. 

1A.

1B.

1C.

1D.

1E.

Содержание ASR1203-OO

Страница 1: ...e and may vary 6mm 1 4 Structure measurements must be verified against the unit to ensure proper fit PRODUCT SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE 3 Way No Share Thermostatic Shower Valv...

Страница 2: ...VENT DAMAGE Keep receipts proof of purchase and place of purchase for this product The receipt is required should it be necessary to request warranty parts MAINTENANCE CARE FOR YOUR AURA PRODUCTS To c...

Страница 3: ...QTY 1 Protective Cover 1 2 Screw AP120 200 4 3 Valve Box 1 4 Hot Water Limiter AP120 204 1 5 Handle Extension AP120 201 1 6 Diverter Retaining Nut AP120 202 1 7 Diverter Cartridge AP120 111 1 8 Set S...

Страница 4: ...Thermostatic Mixer Handle Cap Handle set Screw Volume Control Handle Plastic Washer Volume Control Escutcheon Plastic Washer Cap Handle Set Screw Allen Key Thermo Escutcheon Trim X X Diagram 1 ATTENTI...

Страница 5: ...clockwise REQUIRED REQUIRED Testing Handles and Replacing and Cleaning Stop Filters CAUTION Please check that the marked line on the thermostatic cartridge points to the rectangle notch on the plastic...

Страница 6: ...4 in to the valve Use a Allen key to tighten set Screw 5 Using a wrench screw on the Retaining Nut 3 clockwise Put on the Hot Water Limiter 2 Rotate Thermo Escutcheon 1 to the valve clockwise 5A 5B 6...

Страница 7: ...es are approximate and may vary 6mm 1 4 Structure measurements must be verified against the unit to ensure proper fit Product images and specifications are for illustrative purposes only product desig...

Отзывы: