background image

GDS Series ©2016

6

Installation

GENERAL CONSIDERATIONS FOR ALL 

DISINFECTION UNITS:

1.

When installing the equipment, it is necessary that the

 

unit be isolated from vibration, heavy equipment, and

 

poorly connected piping.

2.

Incoming water temperature to the unit should not

 

exceed 35° minimum to 110° maximum degrees Fahrenheit.

3.

The operating pressure should not exceed 100 psi.

4.

Before  putting  the  unit  into  final  operation  follow

 

sanitation procedures as outlined in this manual for proper

 

disinfection.  Sanitizing  all discharge piping and fittings

 

with household  bleach from disinfection unit to point of

 

use removes existing contaminants and gives the unit a

 

“clean start.”  Be sure to rinse with U.V. treated water.

5.

A proper flow control, included with the unit, must be

 

used to insure only the designated flow through the unit.

6. It is recommended to use UV resistant materials when 

initially installing unit. The UV light can cause PVC or 

other plastic materials to degrade. Becoming brittle, this 

can compromise the pipe or fitting structural integrity.

GENERAL PRECAUTIONS TO BE FOLLOWED 

AT ALL TIMES:
1. Always disconnect electrical power to any U.V. unit

before servicing.
2. Under no circumstances should personnel look at a U.V.

lamp in operation (EXCEPT through an external sight Port

lens located on the outside of the unit).
3. U.V. disinfection units must always be properly grounded.

The GDS series are always placed after the pressure tank

and any other type of treatment devices (i.e. softeners,

filters).
These units are normally installed in a vertical position in 

an enclosed area with good ventilation.  Allow clearance of 

at least the unit’s length at one end for quartz sleeve and 

lamp replacement.  Four (4) anchor bolt holes are provided 

for proper wall support.  Use 

anchors

 with screws for 

sufficient support (not included).  
If your piping system is subject to impulse pressure resulting 

in a “water hammer” condition, a surge tank or other means 

must be provided to remove this condition; otherwise, this 

extreme shock pressure condition may rupture or fracture 

the quartz sleeve.
Make all plumbing connections to allow for ease of service.  

Be sure to follow all local plumbing codes and U.V. 

restriction requirements where specified by local authorities.

STEP BY STEP INSTALLATION:
1. Turn off the water before cutting into the water line.
2. Assess the installation (i.e. type of pipe, size of lines,

etc.) and obtain necessary plumbing fittings for installation.

Inlets and outlets on GDS units are 3/4” FNPT and 1”

MNPT.  Use Teflon tape on all threaded connections and

avoid over tightening.
Note: The flow control is a press in type.  Each unit has 

a 3/4” FNPT and 1” MNPT inlet/outlet machined so 

the flow control can be easily inserted into the feed inlet.  

Make sure the rubber part of the flow control is facing 

outward from the feed inlet.  Simply hand press or slightly 

tap in the flow control until it sits on the inside ledge of the 

machined feed inlet.  
3. Make sure to allow enough room to install, replace,

and clean the quartz sleeve and lamp.  Installing a water

shut-off valve before and after the unit is recommended

to make servicing easy.
4. After mounting, install quartz sleeve, o-ring, and lamp

per instructions.  Turn on the water slowly, check for leaks,

and repair as needed prior to full service operation.
5. After the unit is full of water, plug it into a grounded

110V outlet.  Observe operation through the safety sight

port.  The lamp will show a bright blue glow.  If any

problems are noted, consult trouble shooting guide.

GDS ©2019 • www.aquat.com

Содержание GDS Series

Страница 1: ...tallation Operation and Maintenance Manual CAUTION Read and Follow all safety rules and operating instructions before first use of product Ultraviolet Disinfection Systems MODELS GDS 7 GDS 15 Dealer I...

Страница 2: ...GDS Series 2016 2...

Страница 3: ...lation 6 Installation Diagram 7 Electronic Controls Startup Procedures 8 Sanitation Procedures 10 Maintenance 12 Unit Parts Breakdown 13 Circuit Board Layout 15 Wiring Diagram 16 Troubleshooting 17 St...

Страница 4: ...manufacturer distributor may cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this disinfection system...

Страница 5: ...bracket is secured to the wall and the chamber is held in place by tightening the lock nut to both mounting bracket and chamber The function of this ultraviolet disinfection unit is to provide in exc...

Страница 6: ...rtz sleeve and lamp replacement Four 4 anchor bolt holes are provided for proper wall support Use anchors with screws for sufficient support not included If your piping system is subject to impulse pr...

Страница 7: ...GDS Series 2016 7 Installation Diagram Recommendation Use a 20 micron prefilter to reduce turbidity and for easy sanitation GDS 2019 www aquat com...

Страница 8: ...al status This is also equipped with an internal and external fused surge protection system This solid state electronic circuit board provides the latest in UV lamp monitoring technology U V LAMP CONT...

Страница 9: ...GDS Series 2016 9 Sample Screen Shots Fig 1 Fig 2 Fig 3 Fig 4 GDS 2019 www aquat com...

Страница 10: ...Water in the well and storage tank should be treated with a strong chlorine solution to destroy disease organisms All pipelines and fixtures in the distribution system should be rinsed and flushed wit...

Страница 11: ...and disinfect the water if necessary Plumbing Line Sanitation Only When installing an ultraviolet disinfection system a prefilter with sump may serve as a source to sanitize the water lines only For w...

Страница 12: ...he quartz sleeve through the stainless steel threaded nipples with 0 5 sticking out on each end Use a small amount of plumber s grease and install the o ring around the quartz sleeve Avoid riding the...

Страница 13: ...ING IS THE SOLE PROPERTY OF AQUA TREATMENT SERVICES ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF AQUA TREATMENT SERVICES IS PROHIBITED 2 4 16 A GDS 7 CUSTOMER MANUAL 16 8 1...

Страница 14: ...OPERTY OF AQUA TREATMENT SERVICES ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF AQUA TREATMENT SERVICES IS PROHIBITED N INCHES MAL 010 IMAL 002 SE SPECIFIED 2 2 16 A GDS 15...

Страница 15: ...GDS Series 2016 15 Circuit Board Layout GDS 2019 www aquat com...

Страница 16: ...GDS Series 2016 16 Wiring Diagram ATS 281P CIRCUIT BOARD UV LAMP ATS1 421 GDS BALLAST ATS 4000 PLUG GDS 2019 www aquat com...

Страница 17: ...nstall a voltage regulator Check replace Replace Lamp Check output voltage Replace ballast Trace out and repair Leak at quartz nipple Defective or cracked o ring Replace o ring O Ring not seated prope...

Страница 18: ...3 Open the sterile bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the s...

Страница 19: ...GDS Series 2016 19 GDS 7 15 Specifications GDS 2019 www aquat com...

Страница 20: ...GDS Series 2016 20 Warranty GDS 2019 www aquat com...

Отзывы: