Chill V Series

Section 4: Brief instructions

4.1 Assembly and setting up

It is advisable to set up the equipment so that the  
control unit is towards the front and that the ventilation  
for the refrigeration unit, especially on equipment with  
an air-cooled condenser, (ventilation grille in lower part)  
is not impeded. Ensure a minimum spacing of 0.5m  
between ventilation grille and wall.

4.2 Filling and connection of external circuit

 

•  Fill the equipment with the appropriate circulating liquid to suit the operating  

temp. It should be filled with pure water or a water-glycol mixture (min. 70:30%).

 

•  When using water as the heat carrier for the CHILL-V ensure that there are  

no operating temperatures below 5°C in the outflow. 

 

•  To assist in venting the pump, the pressure connection should be left open  

when the equipment is filled for the first time, otherwise there may be permanent 

 

damage to the pump.

 

•  Remove the plug on the filler opening at the upside. A funnel can be used for filling.

 

•  When starting up for the first time, fill the bath as full as possible, up to the max. level.

 

•  After filling up an external circuit, further liquid may have to be added.

 

•  Connect the pump connections at the back of the equipment to the external circuit. The 

external circuit must be pressure-tight.

 

•  Switch off the equipment before releasing the hose connections; the hose couplings are 

not self-sealing.

 

•   Always ensure maximum flow cross-section in the external circuit (nipples, 

 

tubing, external apparatus). This results in increased flow rate and therefore 

 

better thermostating.

 

•  

The equipment is designed for operation with non-flammable liquids. 

 

Flammable liquids must not be used at temperatures higher than 25°C below  

the flame point

Содержание Chill V Series

Страница 1: ...ATS Chill V Series Re CirculatingChiller Instructional Manual 89 27 Access Road Norwood MA 02062 T 781 769 2800 F 781 769 9979 www qats com ATS Chill V Series...

Страница 2: ...including but not limited to implied warranties of merchant ability and fitness for a particular purpose with regard to the Software and accompanying written and Hardware material This limited warrant...

Страница 3: ...Contents 1 Safety Notes 3 2 Unpacking 3 3 Equipment Description 3 4 Brief Instructions 4 5 Operating Panel 5 6 Technical Data 8 7 Maintenance 8 Table of Contents...

Страница 4: ...or servicing or repair before moving the equipment Drain the bath before moving the equipment Have the equipment serviced or repaired only by properly qualified personnel Other ATS Liquid Cooling Prod...

Страница 5: ...cooled through a heat exchanger located inside the bath Heat of condensation and motor heat are dissipated on air cooled units through a fan cooled ribbed condenser The refrigeration unit is protecte...

Страница 6: ...the pressure connection should be left open when the equipment is filled for the first time otherwise there may be permanent damage to the pump Remove the plug on the filler opening at the upside A f...

Страница 7: ...contact Check the details on the rating label against the supply voltage No warranty applies when the equipment is connected to the wrong supply 4 4 Emptying Place a container underneath the drain co...

Страница 8: ...Lamp AUTO Auto Optimize Auto tuning OVER Over temperature alarm LEVEL Low Level alarm Option Operation Description Basal display status When powered on the upper display window of the instrument shows...

Страница 9: ...e several seconds to several hours After the auto tuning finishes the parameter At automatically changes to OFF If the user wants to run auto tuning again set the setting parameter from At to on Note...

Страница 10: ...p Flow Rate 7 10 L min 15 L min 10L min 10 L min Working mode Continuous Continuous Continuous Continuous Filling Port mm 25 25 25 25 Reservoir Capacity 1 0 L 4 5 L 8 L 8 L Dimensions W x D x H 230 x...

Страница 11: ...here the condenser of the refrigerator has to be cleaned at intervals of 4 to 6 months or more frequently This is best done by blowing compressed air or nitrogen into the ventilation openings for a fe...

Страница 12: ...ality test equipment s and leading edge R D specifically tailored to the telecom LED and computing industries In addition ATS provides thermal design consulting services and training for the electroni...

Отзывы: