Feed control lever (F) must be pulled from (F1) to (F2). This is to engage the overload
clutch. Turn the feed hand wheel (E) clockwise for quill downward feed, and vice-versa.
6.1.6 AUTOMATIC FEED:
For automatic feeding, please take the following steps (Vide Figure 3,):
a. Loosen the quill lock .
b. Turn the power feed transmission engagement crank.
c. Feed speed is in three stages. H, L and M. selection may be made by quill feed
elector.
d. Pull the feed control lever (F) from (F1) to (F2) position (FIG6-4) to engage the
overload clutch for automatic feed mechanism.
e. When the feed control lever knob (D) pressed inward (FIG6-3), it is for downward
feed, and vice-versa. The middle position is neutral.
f. As shown in (FIG6-4), the working depth may be set by micrometer adjustments
nuts (K) (each graduation is 0.001" or 0.02 mm). When the quill stop block (I)
contacts
the micrometer nut (K), the feed control lever (F) may simply jump from (F2) back to
(F1) position owing to the connecting motion between the feed trip lever and feed trip
plunger. This will disengage the overload clutch and stop the spindle feed.
NOTE :
1. Maximum drilling capacity in automatic feed is 3/8" or10 mm.
2. The power feed transmission engagement crank (I)
6-2
(Figure 3) shall be placed at "out" position when the
automatic feed is not in operation. do not move the
power feed transmission engagement crank when the
spindle is in revolution.
FIG6-3
Содержание K5S
Страница 1: ...OPERATING MANUAL HEALTH AND SAFETY GUIDANCE NOTES MODEL K5V DATE 2002 10 01 VERSION 6 ...
Страница 6: ...1 2 ...
Страница 7: ...FIG1 2 1 3 1 4 SAFETY DEVICES AND INSPECTION ...
Страница 8: ...1 4 2 MACHINE SPECIFICATIONS SPINDLE GUARD CE OPTION CHIP TRAY FIG1 3 ...
Страница 14: ...FIG4 2 4 2 5 LUBRICATION 5 1 HEADSTOCK LUBRICATION ...
Страница 26: ...7 3 8 PRECISION ALIGNMENT FIG7 3 ...
Страница 37: ...FIG10 7 10 6 ...
Страница 39: ...12 PARTS LSIT 12 1 12 1 HEAD STOCK UPSIDE 1 ...
Страница 41: ...12 3 12 2 HEAD STOCK UPSIDE 2 ...
Страница 43: ...12 5 12 3 HEAD STOCK UPSIDE 3 ...
Страница 45: ...12 7 12 4 HEAD STOCK INFRASTRUCTURE 1 ...
Страница 47: ...12 9 12 5 HEAD STOCK INFRASTRUCTURE 2 ...
Страница 49: ...12 11 12 6 HEAD STOCK INFRASTRUCTURE 3 ...
Страница 51: ...12 13 12 7 HEAD STOCK INFRASTRUCTURE 4 ...
Страница 53: ...12 15 12 8 COLUMN ASSEMBLY ...
Страница 55: ...12 17 12 9 KNEE ASSEMBLY ...
Страница 57: ...12 19 12 10 TABLE SADDLE ASSEMBLY ...
Страница 59: ...12 11 SPINDLE GUARD CE OPTION 12 21 ...
Страница 60: ...13 SUMMART OF THE ELECTRICAL 13 1 ELECTRICAL COMPONENTS AND LAYOUT 13 1 ...
Страница 62: ...13 3 POWER CIRCUIT 13 3 1 WIRING DIAGRAM FOR STAND ARD ELECTRIC BOX THREE PHASE 13 3 ...
Страница 63: ...13 3 2 WIRING DIAGRAM FOR SIMPLE ELECTRIC BOX THREE PHASE 13 4 ...
Страница 64: ...13 3 3 POWER CIRCUIT CE OPTION 13 5 ...
Страница 65: ...13 6 ...