MACHINE INSTALLATION - OVERVIEW
This section should only be carried out by
Qualified Technical Service Personnel
.
Review the list below and perform as needed.
Explanations are located on the following pages and in
additional manuals.
Inspect the machines for transport damage. Any
transport damage should be noted and witnessed
by the freight forwarder. The manufacturer accepts
no responsibility for transport damage.
Check machines for the correct paytable, glasses,
hardware configuration and that the software
EPROMs are correctly installed on the PCBs.
Install the toplight.
Replace shipping locks with casino specific locks.
Install and connect online/accounting system.
Prepare coin comparator and hopper.
Check that all internal and external connections are
seated correctly.
Apply power to the machine.
Load paper into the printer.
Execute basic machine setup (Initial Setup)
Configure game.
Test bill and coin handling.
M
ACHINE
I
NSTALLATION
Note
:
Depending on machine
configuration and/or
jurisdictional requirements,
additional tasks may have to be
carried out before the machine
can be put into operation (e.g.
acceptance inspection, logicbox
sealing, etc.).
Содержание Slant Top
Страница 1: ...www atronic com Atronic Cashline Slant Top AST Installation Manual Rev 2 3 February 2008 ...
Страница 6: ...6 February 2008 Cashline Slant Top AST Installation Manual blank page ...
Страница 9: ...9 February 2008 Cashline Slant Top AST Installation Manual blank page ...
Страница 14: ...14 February 2008 Cashline Slant Top AST Installation Manual blank page ...