17
April 2008
e-motion™ Installation
M
ACHINE
I
NSTALLATION
MACHINE INSTALLATION
Machine Mounting
Caution! Tipping Hazard
Do not operate the machine unless it has
been properly secured with an Atronic In-
stallation Station (AIS). The machine can
tip over, if it is not properly mounted.
1. Use the Atronic Installation Station (AIS), supplied
by Atronic, to mark the holes on the base before
drilling. Make sure to leave min. 180mm (7.1")
distance to the next machine or a wall on both
sides of the cabinet.
If an AIS is not at hand, use the drilling template
on the next page.
2. Drill four holes 10mm (
3
/
8
") for the AIS mounting
(drillings a) and one out of three holes 10mm (
3
/
8
")
for the machine securing bolt
(drillings d) into the
base. It is not important which of the 3 holes for
the securing bolt is used, if at least one securing
bolt is mounted. If the base stand has braces or
struttings placed below one mounting hole, simply
use another one.
3. Drill or cut out one 55mm (2¼") hole for running
the main cable into the base
(drilling b).
4. Cut out the 60 x 50 mm (3¼") recess for coin
drop into the base stand
(recess c)
5. Secure the AIS to the base using 4 mounting bolts
(delivered with the machine) and fasten with
wingnuts and washer.
Make sure that the boltheads are completely
lowered into the counterbores.
b
c
a
d