![Atop EH9711 Series Скачать руководство пользователя страница 216](http://html1.mh-extra.com/html/atop/eh9711-series/eh9711-series_user-manual_3004814216.webp)
Industrial Managed
Ethernet Switch – EH9711
User Manual
Page
216
of
223
5
Maintenance
Maintenance
menu is the last main menu on the WebUI on the EH9711 Industrial Managed Ethernet Switch. Figure 5.1 shows
all submenus under the
Maintenance
menu. Under this menu, the user can restart the device through the WebUI, reset the
configuration of the device to the original factory default settings, upload new firmware image to update the device, and manage
the configuration of the device. The following sections will describe each submenu under the
Maintenance
menu.
Figure 5.1 Maintenance Menu
5.1
Restart Device
To restart the managed switch (or device) through the WebUI, the user can select the
Maintenance
Restart Device
menu.
The
Restart Device
webpage is showed in Figure 5.2. The user can click on the
Yes
button to restart the device. During the
restarting process, the webpage will be displaying the progress of the restarting operation as shown in Figure 5.3. Note that if
the user selects the
No
button, the web browser will return to the
Port State Overview
webpage without restarting.
Figure 5.2 Webpage to Restart the Device