background image

 

 

38

 

 

 

Picture 38 - Check nr. 1 

Picture 39 

 Inverter connected to the grid 

 
Wait until the display shows the screen with the symbols of HOUSE, PYLON, PV PANEL and BATTERY. 
 

 

Picture 37 

 Display at the switching on: main screen 

 

2.

 

Before the inverter connects to the grid (it usually takes at least 30 seconds), check on the display of RA.Store-
K-F that: 

 

the power placed under the icon of the pylon of the GRID must be negative and equal as absolute value to 
the  power  place  under  the  icon  of  the HOUSE (but  with  positive  sign  +) 

as  shown  in  the  example  below 

(Picture 38, Check n.1).

 

 
 
 

 

 
 
 
 
 
 

If the check is not possible because the inverter is linked up to the grid and the screen has changed as the 
following in Picture 39 (battery power < 0 W), lower (OFF) the magneto-thermal breaker QG1 (GRID LINE); 
wait a minute and raise it, then check the condition described in the previous point 

"2”.

 

 
 
 
 
 
 
 
 
 
 

If the power shown under the icons 

ELECTRICITY PYLON and HOUSE is “0 W”, check that the CT sensor is 

correctly installed and there are no interruptions on the cable or any wrong connections 

(check eventual 

junctions or the connection of the CT connector on the terminal box of the RA-K-F). 
 
 
 
 
 
 
 

NEGATIVE POWER OF 
THE GRID (-)

 

 

POSITIVE POWER OF 
THE HOUSE (+)

 

 

SAME ABSOLUTE VALUE 
OF POWER 

 

 

INVERTER CONNECTED 
TO THE GRID: BATTERY 
POWER < 0 W 

 

INVERTER CONNECTED 
TO THE GRID! THE 
CHECKING TIME IS 
OVER! 

 

Содержание RA.Store-K-F

Страница 1: ...a Circonvallazione 57 B 47923 Rimini RN Operational seat Via Guido Rossa 5 41057 Spilamberto MO Tel 39 059 783939Fax 39 059 784323 E mail info atonstorage com Sito web www atonstorage com RA Store K F...

Страница 2: ...llation 11 3 2 1 Handling of the system 12 3 2 2 Preliminary stages 12 3 2 2 1 Removal of the plastic parts 13 3 2 2 2 Removal of the batteries 16 3 2 2 3 Application of auxiliary handles on the basic...

Страница 3: ...on portal for the final customer 48 3 5 Reassembly of the structure 48 4 Replacement parts and maintenance 49 5 Replacement of a battery module 50 Appendix A Switch off and on the system 53 Appendix B...

Страница 4: ...guarantee of good functioning and the full compliance of the performances of the storage system are strongly connected to the correct commitment of all instructions that are contained in this Manual 1...

Страница 5: ...ioning Avoid the direct contact with the body during the functioning Before executing any activity on the product switch it off and leave it cool enough Respect all the indications given in the manual...

Страница 6: ...1 5 Safety In order to avoid any damages to people and objects during transport installation and use the next points must be followed The storage system must be installed in fully compliance with the...

Страница 7: ...vices are authorized to enter the place where the storage system is located The risk of electrocution is available during the phases of fire extinguishing because the storage system is switched on and...

Страница 8: ...rical operations on it Only technical staff in possession of the requirements described in the paragraph 1 5 Safety is authorized to execute the handling activities Risk of fire It is possible that ve...

Страница 9: ...arehouse for a period of time longer than 6 months During the warehousing period the orange pole of the module must not be connected to other battery modules 2 4 Transport of the battery modules The l...

Страница 10: ...n be damaged Check inside the storage system before starting the installation Start with the installation steps only in absence of condensation inside the storage system If the system is transported a...

Страница 11: ...Failure to comply with the instructions provided may cause irreparable damage to the storage system and to the surrounding environment ATTENTION Install the system in a room that must be dry covered...

Страница 12: ...e Removal of the external plastic parts Removal of the batteries Application of auxiliary handles on the basic structure Transport of the basic structure batteries and plastic parts separated Disassem...

Страница 13: ...s that fix the upper panel to the rest of the structure and then remove it by pushing as shown in the following picture Picture 2 Picture 2 Removal of the fixing screws of the upper panel Picture 3 Re...

Страница 14: ...e and remove it from its housing Figura 6 Removing the top protection The control card is placed in the upper part of the system Disconnect the connector showed in the following picture Picture 7 Pict...

Страница 15: ...15 Picture 8 Disassembly of the led lights angle Picture 9 Disassembly of the led lights angle...

Страница 16: ...ion voltage of 1000 Vdc Do not rest tools or metal parts on top of batteries Before starting any activity switch off the storage system Put on OFF all the protections contained in the electrical panel...

Страница 17: ...iring and fixing accessories to be removed for each battery module unscrew the 2 screws that keep it together with the chassis and the screw for the equipotential bond disconnect all wiring related to...

Страница 18: ...3 2 2 3 Application of auxiliary handles on the basic structure Fix to the structure the adequate provided handles in the 4 points showed in the following pictures Picture 12 Picture 13 Picture 12 App...

Страница 19: ...rew the 4 handles used for the transport and keep them for the next installation For each battery reconnect the earth cable previously disconnected and place it again inside the structure inverted pro...

Страница 20: ...14 Restore of the connections data signals cables Port RJ45 RS485 cable BATT 485 1 CAN port CAN BMS cable RJ45 port Link Port 0 RJ45 port Link Port 1 Picture 12A Restore of the connections data signa...

Страница 21: ...r the procedure of switching off follow the steps indicated in Appendix B Switch off and on the batteries Picture 15 Switch on of the batteries 3 2 2 7 Reassembly of the plastic parts Put again in the...

Страница 22: ...rnating current of functioning with a direct component In order to protect the product from indirect contacts install a RCD residual current device on each electrical line in alternating current in ou...

Страница 23: ...ion the terminal that is connected to the screw on the frame of the storage system must have an eyelet terminal with an 8 mm hole Picture 16 Screw for the connection of the mass of the storage system...

Страница 24: ...aced so that the writing House goes towards the house customer and the writing Grid goes towards the bidirectional meter M1 Picture 19 Placement of the CT sensor In the following pictures there is a m...

Страница 25: ...25 1 Parallel on the disconnector of the GRID line Picture 20 Example of placement of CT nr 1 parallel on the disconnector of the Grid line...

Страница 26: ...26 2 Parallel on the differential breaker upstream the house Picture 21 Example of placement of CT nr 2 parallel on the differential breaker upstream the house...

Страница 27: ...ring will be closed on two cables Picture 22 Example of placement of CT nr 3 parallel on the differential breaker downstream the meter M1 Put the other end of the cable of the CT sensor through a slot...

Страница 28: ...Picture 25 Line Meter Terminal box QG M1 Terminal 5 of the terminal box QG M1 connected to the white conductor of the CT sensor Terminal 6 of the terminal box QG M1 connected to the black conductor o...

Страница 29: ...pet foreseen for works done on hazardous electrical components Before starting with the connection procedure do the following checks on the electrical cables that come down from the PV panels Check wi...

Страница 30: ...picture Picture 27 Derivation cables from the string panel equipped with MC4 connectors Label the cables deriving from the panels strings string 1 string 2 and connect them to the connectors placed on...

Страница 31: ...tore K F MC4 connectors connected MPPT1 connectors serigraphy 1 MPPT2 connectors serigraphy 2 Picture 29 Restore of the strings and check that on the MC4 connectors V 550 Vdc ENTRY STRING 1 ENTRY STRI...

Страница 32: ...A class A installed on the GRID line in derivation from the RA Store K F terminal An differential magnetothermal bipolar type with maximum residual current equal to 300 mA class A installed on the EPS...

Страница 33: ...of the GRID line and EPS line Sheathe the cables and pass them through a slot located on the back of the structure Picture 31 Picture 31 Slots of Grid and EPS cables 1 OFF 2 CHECK THAT VGRID 0 V Slot...

Страница 34: ...lies or withdraws energy only when the national grid is active V grid 230 Vac 3 3 6 3 EPS Line AC Back up The power line called EPS terminal block QG M1 terminals L2 2 N2 2 is the ac line of back up t...

Страница 35: ...uctor color blue terminal N1 1 GROUND conductor color greenyellow terminal GND Tightening torque to be applied to the line wiring terminals Grid 1 7 Nm Linea EPS morsettiera QG M1 Without the switchbo...

Страница 36: ...ply line of the house Check the correspondence of phase and neutral on the terminals of the GRID line L1 1 and N1 1 and EPS line L2 2 and N2 2 Picture 34 Check of the correct connection of Phase and N...

Страница 37: ...e K F electrical panel 1 Put on ON the breaker QG1 GRID and QB1 BATTERY Picture 36 Picture 36 All the breakers of the electrical panel in ON position QB1 QPV1 SPV1 QPV2 SPV2 QG1 QE2 COMPONENT NAME ELE...

Страница 38: ...the check is not possible because the inverter is linked up to the grid and the screen has changed as the following in Picture 39 battery power 0 W lower OFF the magneto thermal breaker QG1 GRID LINE...

Страница 39: ...t the differential breaker placed upstream the house and the breaker placed downstream the RA Store K F are raised 4 Close the 2 rotary disconnectors QPV1 e QPV2 as shown in Picture 41 QE2 EPS can be...

Страница 40: ...AC lines of the building lower the disconnectors GRID and EPS placed on the electrical panel on the storage system 3 4 2 Functioning test in ON GRID mode By switching on and off some household applian...

Страница 41: ...F In case such values are not compatible with the activated household appliances check the placement of the CT sensor see paragraph 3 3 4 Placement and connection of the CT Check moreover that the fir...

Страница 42: ...y of energy stored in the battery Energy Soc Led 6 at the bottom Led 5 Led 4 Led 3 Soc 90 green green green green 60 Soc 90 green green green OFF 30 Soc 60 green green OFF OFF 20 Soc 30 green OFF OFF...

Страница 43: ...o the privileged household appliances will be disconnected for 5 seconds Lower the general bidirectional meter downstream the public grid Picture 47 Simulation of a blackout of the national electrical...

Страница 44: ...vileged household appliances fed by the magneto thermal breaker EPS LINE if available are functioning Reconnect the electrical supply line of the house 3 4 5 General information FW Bios etc and Self t...

Страница 45: ...ture 52 Access to the menu Inverter To execute the Self Test Directive CEI 021 select the item Self Test then Start Test Picture 53 and Picture 54 Picture 53 Access to the menu Self Test Picture 54 Or...

Страница 46: ...the arrow up and arrow down keys in order to see all the test results Press repeatedly the ESC key until you go back to the main screen 3 4 6 Communication of the system Check on the display that insi...

Страница 47: ...name and Password created during the registration of the machine on the portal that refer only to the machine you are going to install Picture 57 Access to Aton web portal Access the website with the...

Страница 48: ...d during the registration of the machine 3 5 Reassembly of the structure Put each of the three side panels in the runners at the bottom and the pins at the top must enter the adequate runners Replace...

Страница 49: ...n of the system can also perform the operations of replacing the internal components Even authorized technical personnel before proceeding with the replacement of internal components to the storage sy...

Страница 50: ...dules as described in the technical Appendix Appendix B Switch off and on the batteries On the battery module that must be replaced execute the following steps Picture 60 Unscrew the 4 screws that kee...

Страница 51: ...Switch off and on the system Picture 60 Replacement of battery module Removal module screws equipotential bond screw signal and power connections Picture 61 Connection restore data signals cables Por...

Страница 52: ...52 Picture 62 Connection restore data signals cables...

Страница 53: ...PV2 FIELD 4 QPV1 PV1 FIELD 5 QB1 BATTERY In order to switch on again the system raise the disconnectors in the following order 1 QB1 BATTERY 2 QPV1 PV1 FIELD 3 QPV2 PV2 FIELD 4 QG1 GRID 5 QE2 EPS Pict...

Страница 54: ...Put the breakers on each battery in the position 0 Picture 64 battery shutdown sequence In order to switch on the batteries 1 place on 1 the breakers of all batteries 2 press the red button SW of the...

Страница 55: ...tput current A 14 16 24 5 Total harmonic distortion THD 3 3 3 Adjustable displacement factor 0 8 overexcited 0 8 underexcited 0 8 overexcited 0 8 underexcited 0 8 overexcited 0 8 underexcited Contribu...

Страница 56: ...tection Magneto thermal breaker Magneto thermal breaker Magneto thermal breaker Battery protection Magneto thermal breaker Magneto thermal breaker Magneto thermal breaker External protections on the P...

Страница 57: ...td 802 11 b g 2 4 GHz IEEE Std 802 11 b g 2 4 GHz IEEE Std 802 11 b g LAN optional 10 100 Mbps 10 100 Mbps 10 100 Mbps Wireless home automation optional EnOcean 868 MHz EnOcean 868 MHz EnOcean 868 MHz...

Страница 58: ...on card only applicable on SLOT6 AP842 Communication card RS485 AT814 ATN105 CV814 105 Three phase power meter for installation on three phase power grid Acrel DTSD1352 20 80 A Single phase power mete...

Страница 59: ...8 138 RAK3K2SH7 5FL 3 7 2 161 RAK3K2SH10FL 4 9 6 184 RAK3K2SH12 5FL 5 12 207 RAK3K2SH15FL 6 14 4 230 RAK4K2H2 5FL 1 2 4 115 RAK4K2SH5FL 2 4 8 138 RAK4K2SH7 5FL 3 7 2 161 RAK4K2SH10FL 4 9 6 184 RAK4K2...

Страница 60: ...82 Weight with one battery module kg 101 103 105 Weight with two battery modules kg 124 126 128 Weight with three battery modules kg 147 149 151 Weight with four battery modules kg 170 172 174 Weight...

Страница 61: ...NO Move or turn the CT PUT ON ON THE MAGNETO THERMAL BREAKER QB1 BATTERY AND QG1 GRID LINE STEP 1 STEP 0 STEP 2 QG1 ON WITHIN 30 SECONDS CHECK 0 W THE ALGEBRIC SUM OF THE HOUSE POWER AND GRID POWER I...

Страница 62: ...YES The CT is correctly installed STEP 3 STEP 4 Repeat the procedure from STEP 0 THE INVERTER IS ON GRID CHECK THE POWER SUPPLIED BY THE BATTERY IS DIFFERENT FROM 0 W 0 W CHECK THE POWER SUPPLIED BY T...

Отзывы: