Installation, Operation & Maintenance Guide

 

Matterhorn 1000/1002 

6

1-888-MY-AIR11        CAG-06-21-003        AtmosAir.com

02 

INSTALLATION

The Matterhorn 1000/1002 series equipment can be mounted 
in-duct, using the faceplate mounting flange and its 
weather-strip gasket, or inside a plenum using a semi-custom 
mounting bracket. The units operate best when located after 
all filters, coils, and fans. Various mounting arrangements are 
possible; however, the available options may be limited due 
to size and configuration restrictions. Use the Duct Cut-Out 
and Quick-Change Plate Procedure for ideal placement of the 
Matterhorn 1000/1002 models. 

When mounted on the side of a duct or air handler wall, the 
enclosure should not be exposed to moisture. If installing on 
outdoor exposed ductwork, a weatherproof enclosure with an 
access panel for servicing should be installed over the AtmosAir 
equipment. Contact AtmosAir Sales for A.W.E. specifications.

The AtmosAir Matterhorn 1000/1002 series operates on 120 VAC, 
50/60 Hz. The tube and electrode contacts should not come into 
contact with any conductive surface. A minimum 50.8mm (2”) 
clearance around the tube is recommended.

Mechanical Installation

1. 

Carefully remove the equipment from its shipping 
container. Inspect the main components, gasket, and 
tube(s) for damage. Verify that the unit’s voltage rating is 
the same as the available voltage, 120 VAC. 

2. 

Install the ionization tube: Gently pull the conductor 
strap back to allow the tube to turn freely; screw the end 
screw of the tube into the tube holder hand-tight utilizing 
the blue cap, 

DO NOT TWIST THE TUBE OR MOVE THE 

EMITTER SCREEN. DO NOT OVER-TIGHTEN THE TUBE! 

Once the tube is secure, return the conductor strap to its 
normal position and 

ENSURE SOLID, FLAT CONTACT IS 

MADE WITH THE TUBE’S OUTER MESH.

3.  Location and Orientation: 

Install the unit downstream 

of filters, coils, and fans with the ionization tubes vertical 
whenever possible (When installing a dual F Tube setup, 
the tubes 

MUST

 be mounted vertically, and ‘S’ clips are 

recommended); If multiple units are installed in the same 
duct, stagger the units in the airflow so they are not in the 
same airflow path. 

4. 

The standard Matterhorn 1000/1002 power cord is 3.05 
meters (10’) long. Be sure to consider receptacle location in 
your placement plan. The receptacle or junction box must 
be within 2.44 meters (8’) of the M 1000/1002.

5.  For in-duct installation: 

Verify the flange gasket is in 

place and not damaged to ensure the unit seals properly. 
When making a cut-out in the duct, ensure there is at 
least 25.4mm (1”) clearance from the duct wall on all four 
sides before cutting the 139.7 mm (5½”) high × 152.4mm 
(6”) wide mounting cut-out. A galvanized steel template 
is included for ease of installation; use the inner lines to 
cut the cut-out hole, then trace the cut-out and mark 
the locations of the mounting holes for the Matterhorn 
1000/1002 series. The semi-circular cutout in the template 
should be oriented upstream if possible.

6. 

Using the marked holes from the backer-plate template, 
affix the unit securely in the duct using self-tapping 
screws (if not using backer-plate). Do not over-tighten, 
this may strip the screw hole. The unit is self-sealing to the 
duct, so no further sealing is needed. 

Continue on Next page

Not Acceptable

Acceptable

Содержание Matterhorn 1000 Series

Страница 1: ...s pure natural state where no pollution or contaminants exist while reducing energy use and emissions in the process AtmosAir com CAG 08 21 004 IMPORTANT Save this Document for Future Reference Warran...

Страница 2: ...ch installation or repair step exactly as shown and explained in this guide Observe all local state national and international electrical codes Pay close attention to all warnings and caution notices...

Страница 3: ...r otherwise All persons having access to the serviced premises should comply with applicable public health laws and guidelines issued by federal state and local governments and health authorities such...

Страница 4: ...tallation 6 Mechanical Installation Continued 7 Duct Cut Out and Quick Change Plate Procedure 8 Duct Cut Out and Quick Change Plate Procedure Continued 9 Electrical Installation 9 Installation Dimensi...

Страница 5: ...d for minimal maintenance efforts The 1000 1002 series has two components that require inspection and maintenance 1 AtmosAir Matterhorn 1000 series base unit components 2 Ionization tubes Because ther...

Страница 6: ...d tight utilizing the blue cap DO NOT TWIST THE TUBE OR MOVE THE EMITTER SCREEN DO NOT OVER TIGHTEN THE TUBE Once the tube is secure return the conductor strap to its normal position and ENSURE SOLID...

Страница 7: ...8 Units should be installed to allow easy access for maintenance Install units so that the 5 step power adjustment knob and status light are easily accessible and visible 9 In the case of the M1000 t...

Страница 8: ...learance is recommended Procedure 1 Always measure for clearances for the tubes and wires prior to any other steps Then place the Q C P in the appropriate area 2 Holding the Q C P in place use a marke...

Страница 9: ...pproximately 6 watts per tube An internal 1 25 amp slow blow fuse protects the unit Follow proper electrical procedures guidelines and codes for providing power to the systems including requirements f...

Страница 10: ...ion Operation Maintenance Guide Matterhorn 1000 1002 10 1 888 MY AIR11 CAG 06 21 003 AtmosAir com Contact Us 1 888 MY AIR11 1 888 692 4711 Matterhorn 880 882 Installation Operation and Maintenance Gui...

Страница 11: ...ES TO AFS 262 AIRSWITCH SHEET 1 OF 1 UNLESS OTHERWISE SPECIFIED SCALE 1 3 REV B DWG NO A SIZE TITLE NAME DATE COMMENTS FIELD WIRING DIAGRAM FOR CONNECTING MATTERHORN TO AFS 262 AIR SWITCH TO LINE VOLT...

Страница 12: ...act Recommended Maintenance Procedures Visually check the performance of the system by checking the green lights on the individual units If the lights are on then the unit should be functioning proper...

Страница 13: ...er degeneration of the dielectric material that causes the dielectric to fail and arcing to occur Inspect the tube for black dots indicating failed dielectric 7 If physical inspection has not revealed...

Страница 14: ...use a flathead screwdriver to pop the fuse drawer towards you Above Matterhorn 1000 Ionization unit Here you will see there is one Ionization Tube installed towards the center of the device This shoul...

Страница 15: ...ean and pure quality air that is typically found at higher mountain elevations AtmosAir s unique and proven air purification process significantly reduces mold controls the spread of bacteria and airb...

Страница 16: ...IGATIONS OF CLEAN AIR GROUP HERIN ARE EXPRESSLY GRANTED IN LIEU OF ALL WARRANTS WHETHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICUL...

Отзывы:

Похожие инструкции для Matterhorn 1000 Series