For models supplied with slide rails.
1.
The handset holder (Fig.4) can be positioned on the riser rail at the required height by twisting the grip ring clockwise.
Select handset and re-tighten. The angle of shower spray is adjusted by moving the handser in its holder.
2.
When choosing the position of the riser rail, (Fig.5) allowances should be made to accommodate the tallest person
using the shower on a regular basis.
- Fit the slider assembly to the rail.
4. In order to achieve the maximum efficiency from the unit please use the 4 positions spray to adjust the required
temperature and the water flow to the user’s comfort.
5. For enjoyable use and in order to avoid scale, the shower head jet spray should be periodically cleaned
General information
1. Only a licensed electrician should install the appliance.
2. It is recommended that a residual current device (ELCB) will be installed on the main board, prior to the installation of the appliance.
3. Water installation must be made prior to the electric installation. After water installation is completed, you must check the system
for water leakage.
4. The operation of the appliance requires water pressure of minimum 0.3 bar (4LBS/IN). The appliance should be
horizontally installed, where water supply comes from the lower left side only.
5.
WARNING!
You should use only the supplied outlet accessories. The water outlet must always be left open as the operating principle
is based on an open water outlet.
6. The spray head must be regularly cleaned to avoid and remove scale.
7. Warning - Do not switch the appliance ON, if there is a possibility that the water in the heater are frozen.
8. Without supervision the use of the appliance by young children or infirm person is forbidden. Playing with the unit by young children
is forbidden.
Installation of a shower &handwash unit 3 kW up to 9.5 kW
1.
The unit should be installed above a person's height (using installation chart with 4 wall plugs and
4 screws supplied)
2.
Take off the unit cover in order to connect the electric cable to the terminal block inside the unit.
(Fig no. 1)
3.
The shower unit should have a separate electric cable in the switch board (see table 2)
4.
The recommended electric cable for a 2-phase unit, up to 9.5kW is 5 x 4.0mm
2
5.
A110V device of 3kW must be connected to a 30A separate fuse feeding cable of 3 x 4mm
2
. For a 5kW/110V unit
fuse of 50A and feeding cable of 3 x 10 mm
2
6.
Check if there are no leaks as soon as the unit is connected.
Use the hoses supplied with the appliance, do not re-use old hoses
7.
After connecting the water source to the unit, connect the electric cable to the terminal block, including the grounding.
WARNING! The appliance must be grounded.
8.
The unit should be connected to the electric supply by a 2-pole switch (for one phase unit) and to the multi-pole switch
(in case of a multi phase unit)
9.
The electric current switch must be separated from the unit.
10. Connect the electric cable to the clamp.
11. Adjust the knobs and close the cover with 4 screws. See mounting table (Fig no. 1) Make sure the cover is placed
and gripped with the snap.
For effective use
1.
Turn on the water valve slowly, until the neon lights in the rocker switch are in ON position. Wait 15-20 seconds,
until hot water starts flowing (The unit has an integrated valve. No need of an external valve). For colder water
gradually increase the water flow until you receive the desired temperature. For hotter water please decrease the
water flow.
2.
Selector heating position :
0- shut off
1 - low ( light no. 1 ON)
2 - medium (light no.2 ON)
3- high (both lights ON)
3.
The unit operates automatically upon opening the water valve and shuts off when closing the water supply.
Danger
Incorrect installation
Incorrect:
Danger: Do not
install a valve at
the water outlet
We do our best to ensure a comfortable and enjoyable use of Atmor’s Instant Water Heater.
- Fit the rail ends to the rail, ensuring that the
crimp on the end of the rail fits into the key
way in the bottom rail end.
- Offer the rail assembly up to the wall in the
desired position and mark the fixing hole
centers through the fixing holes in the rail ends.
- Drill the wall using a 6 mm masonry drill and
insert The wall plugs (provided).
- Fix the rail to the wall using the screws
(provided) and fit the rail end caps.
- Clip the soap dish to the riser rail.
- When installation has been completed the
handset can be connected to the hose and can
be placed in its holder ready for use. It is the
conical connector of the hose which grips into
the holder.
ON
OFF
TEST
F o r P l a t i n u m E L C B m o d e l
ELCB - Earth Leakage Circuit Breaker or
Residual Current Device
Test the ELCB periodically. By pressing the
test button The ELCB must trip to “off” position.
(The arm below must move downwards).
Push the arm up to “on” the heater again
Fig. No. 6
1
2
Fig. No. 4
Fig. No. 5
4 p o s i t i o n s p r a y
Spray+Massage
Spray
Massage
Jet
Led light
Power setting
Water valve
Off position
Water inlet
Open
maximum flow
Correct
Must be installed with
pressure hose in water inlet
Water
Outlet
Water
Outlet
Sink
Sink
Sink
Sink
Sink
Sower
O.K.
Correct installation