Installation Steps
8
PV-10PX / PV-10HPX
Installation Steps
A. Location of installation
Check and ensure the installation location (concrete, layout, space size etc.) is
suitable for lift installation.
B. Use a carpenter’s chalk line to establish
installation layout of base plate
Fig. 5
C. Check the parts before assembly
1. Packaged lift and hydraulic power unit.
Fig. 6
Chalk Line
137.5 in