Atlas H151 Скачать руководство пользователя страница 1

Operation & Installation Instructions

OWNERS MANUAL

www.atlasuv.co.uk

L12, L22, L41, L57, L79 (Standard Output)

H38, H53, H95, H151 (High Output)

Содержание H151

Страница 1: ...Operation Installation Instructions OWNERS MANUAL www atlasuv co uk L12 L22 L41 L57 L79 Standard Output H38 H53 H95 H151 High Output ...

Страница 2: ...upply with a UV system gives you reassurance that your family will have access to safe drinking water throughout your entire home with no chance of microbiological contamination This is a chemical free process which is simple in its concept and effective in its ability to inactivate microorganisms present in the water supply Simple maintenance continuous disinfection and ultimately safe water Atla...

Страница 3: ...sor 13 Operation 14 Controller 14 Power up Sequence 14 Operational Screens 15 Operational Screens with UV Monitor Upgrade 16 UV Intensity with UV Monitor Upgrade 16 Lamp Countdown Sequence 17 Lamp Countdown Reset Sequence 17 Failure Modes 18 QR Codes 18 Expansion Modules 19 Atlas UV Standard Output System Specifications 20 Atlas UV High Output System Specifications 21 Limited Warranty Statement 22...

Страница 4: ...facturer for service instructions if required 7 Do not use this system for any purpose other than what it was intended for Misuse of this system could potentially cause harm to the user or others 8 Your system is intended to be installed indoors and away from leaking plumbing DO NOT plug the unit in if the system or any of the components are wet 9 The disinfection system should be directly install...

Страница 5: ... required will depend on parameters being treated Hardness 7 gpg 120 mg L if hardness level is 7 gpg or slightly below the quartz sleeve must be cleaned periodically in order to ensure effi cient UV penetration if above the water should be softened Iron Fe 0 3 ppm 0 3 mg L Manganese Mn 0 05 ppm 0 05 mg L Turbidity 1 NTU Tannins organics 0 1 ppm 0 1 mg L UVT transmittance 85 Please contact Atlas if...

Страница 6: ...6 P a g e Assembly Unpack the system and ensure all the components are included with the system Your system is shipped with the following components L Series Standard output lamp systems ...

Страница 7: ...7 P a g e H Series High output lamp systems ...

Страница 8: ... systems choose a location where the main cold water line is accessable The system must be installed after other water treatment equipment softener or filters but before any branches See Figure 1 For Point of Use POU systems install the unit just before the tap Atlas recommends that a 20 micron filter be installed before the UV system for a final polishing step before the water is disinfected Figu...

Страница 9: ... fasteners to mount the UV reac tor to wood or drywall If mounting to an alternate material you will need to purchase the proper corresponding fasten ers Step 4 For water supplies where the maximum flow rate is unknown a flow restrictor is recommended so that the rated flow of your particular Atlas system is not exceeded The flow restrictor should be installed on the outlet port of the reactor Ste...

Страница 10: ...o ring onto the sleeve until it is butted up against the reactor Figure 4 Quartz Sleeve Installation Step 7 Hand tighten the provided gland nut over the quartz sleeve onto the threaded end of the reactor It has a positive stop to prevent over tightening A firm force may be required to fully tighten the gland nut but DO NOT USE TOOLS for this step Insert the provided stainless steel compression spr...

Страница 11: ...onnections see Figure 1 Always mount the controller verti cally For monitored systems insert the sensor connector into the IEP port located on the right side of the controller Figure 6 For the sensor to be recognised by the controller the controller power must be plugged in last Do not plug the controller power cord in before the last step Step 11 Always hold UV lamps by their ceramic ends not by ...

Страница 12: ... most are 5 25 chlorine Replace the filter housing and slowly turn on the water supply Step 3 At a water outlet run the water until bleach can be smelled Repeat this for all taps toilets shower heads refrigerators outdoor taps the washing machine dishwasher etc at the home or facility Once finished wait a minumum of 30 minutes before continuing Step 4 Reinstall the filter cartridge into the filter...

Страница 13: ...cloth Step 11 Replace the o ring and slide the sleeve back into the reactor following steps 7 and 8 from the installation section of the manual Cleaning the UV Sensor Depending on the water quality the UV sensor may require periodic cleaning At a minimum the UV sensor should be cleaning on an annual basis The following steps outline a basic clean ing procedure Step 1 If a by pass assembly is insta...

Страница 14: ... to providing any applicable fault messages and system diag nostics The controllers used in both the monitored and non monitored systems are identical All controllers in clude an infinite expandability port located on the right side of the controller Optional modules like the UV sen sor can be plugged into the expandability port of an Atlas controller to give additional features Power up Sequence ...

Страница 15: ...low the lamp to reach its optimum output followed a final start up complete screen The system will now be ready to disinfect water flow Operational Screens On systems without the UV monitor the default screen shows the Atlas Home Screen At any point during operation the user is able to scroll through the Atlas Home Screen Lamp life re maining and QR Code Contact Info screens by pressing the push b...

Страница 16: ...s display the level of UV light detected by the sensor UV intensity can be affected by poor water quality scaling on the quartz sleeve and or sensor lamp failure or lamp expiring The following screens show the UV Intensity dropping Below 56 the numbers and warning sign turn red and an audible chirp is given by the ballast every 15 seconds Below 51 the screen is solid red and a constant audible ala...

Страница 17: ...period of five seconds after which the screen below will be displayed After the seven days deferral expires the alarm will sound once again The deferral can be repeated as many times as you wish PLEASE NOTE At any point after lamp expiration the water may be unsafe for consumption and should not be consumed without another form of disinfection Lamp Countdown Reset Sequence When changing the lamp t...

Страница 18: ...for human consumption during this period the water must be boiled minimum 20 minutes at a full boil prior to consumption QR Codes A QR code Quick Response code is a matrix barcode first designed for the automotive industry Atlas uses the QR code to store a link to a specific page on our website Users with a camera phone equipped with the correct reader application can scan the image of the QR code...

Страница 19: ...n normal operation the OK and COM contacts will be connected and in a fault condition Low UV Lamp fail Power Fail the Fault and COM contacts will be connected Maximum Contact Rating is 1A 120 230V AC DC use 16 22 AWG SOLENOID CONNECTION MODULE Connects a NORMALLY CLOSED line voltage solenoid valve to the system On a non monitored system the sole noid will only close on a lamp failure error On a mo...

Страница 20: ... Sleeve RQ 12 RQ 22 RQ 41 RQ 57 RQ 79 Reactor Dimensions 6 4 x 36 4 cm 2 5 x 14 3 6 4 x 54 2 cm 2 5 x 21 3 6 4 x 89 5 cm 2 5 x 35 2 6 4 x 101 6 cm 2 5 x 40 0 8 9 x 91 7 cm 3 5 x 36 1 Chamber Material 304 Stainless Steel A249 Pressure Rated Tubing Controller Dimensions 17 2 x 9 2 x 7 6 cm 6 8 x 3 6 x 3 Operating Pressure 0 7 10 3 bar 10 150 psi Operating Water Temperature 2 40 C 36 104 F UV Monitor...

Страница 21: ...ent Sleeve RQ H38 RQ H53 RQ H95 RQ H151 Reactor Dimensions 8 9 x 41 8 cm 3 5 x 16 5 8 9 x 50 8 cm 3 5 x 20 0 8 9 x 68 3 cm 3 5 x 26 9 8 9 x 103 4 cm 3 5 x 40 7 Chamber Material 316 Stainless Steel A249 Pressure Rated Tubing Controller Dimensions 21 7 x 10 8 x 8 9 cm 8 6 x 4 2 x 3 5 Operating Pressure 0 7 10 3 bar 10 150 psi Operating Water Temperature 2 40 C 36 104 F UV Monitor Port Yes optional U...

Страница 22: ...able for any costs of removal installation transportation or any other charges which may arise in connec tion with a warranty claim Products which are sold but not manufactured by Atlas are subject to the warranty provided by the manufacturer of said products and not by Atlas warranty Atlas will not be liable for damage or wear to products caused by abnormal operating conditions ac cident abuse mi...

Страница 23: ...E BY ATLAS WITH RE SPECT TO THE PRODUCT AND IS GIVEN IN LIEU OF ANY OTHER WARRANTY TO THE EXTENT AL LOWED BY APPLICABLE LAW ANY AND ALL EXPRESS OR IMPLIED WARRANTIES NOT SET FORTH HEREIN ARE WAIVED AND DISCLAIMED INCLUDING ANY IMPLIED WARRANTY OF MERCHANT ABILITY OR FITNESS FOR A PARTICULAR USE ATLAS LIABILITY UNDER THIS LIMITED WARRANTY IS LIMITED SOLELY TO THOSE LIABILITIES SET FORTH ABOVE IN TH...

Страница 24: ...2 4 P a g e www atlasuv co uk PN 910086 ...

Отзывы: