Maintenance Schedule
40
PV-15PX
Maintenance Schedule
Monthly:
1. Re-torque the anchor bolts to 60-86 Ft Lbs;
2. Check all connectors, bolts and pins to insure proper mounting;
3. Lubricate cable with lubricant;
4. Make a visual inspection of all hydraulic hoses/lines for possible wear or
leakage;
5. Check the condition of the safety lock device;
6. Lubricate all rollers and pins with 90wt. Gear oil or equivalent;
Note: All anchor bolts should take full torque. If any of the bolts do
not function for any reason, DO NOT use the lift until the bolt has been
replaced.
Every six months:
1. Make a visual inspection of all moving parts for possible wear, interference or
damage.
2. Check and adjust as necessary, equalizer tension of the cables to ensure level
lifting.
3. Check columns for plumb.
4. Check rubber pads and replace as necessary.
5. Check safety lock device and make sure the condition is suitable.
Содержание PV-15PX
Страница 32: ...PV 15PX Exploded View 33 PV 15PX PV 15PX Exploded View Fig 40 ...
Страница 33: ...PV 15PX Exploded View 34 PV 15PX Cylinders Fig 41 ...
Страница 34: ...PV 15PX Exploded View 35 PV 15PX ATLAS Manual power unit Fig 42 220V 60HZ Single Phase Fig 42 ...
Страница 35: ...PV 15PX Exploded View 36 PV 15PX Illustration Of Hydraulic Valve Fig 43 ...