
25
Vertical Model
1
Drilling
points
A
2
Drilling
points
Screw
A
B
B
Fix the wall bracket to the floor
and against the wall. Identify
the drilling points A. These give
the position of the lower fixings.
Move the wall support up,
causing the points previously
identified with the drilling holes
A to coincide.
Mark the 2 drilling points B
using a ball point pen.
3
Drill the 4 holes and put appropriate raw plugs in your wall (e.g.
plaster board, concrete). Position the bracket and screw it in.
CONNECT THE RADIATOR
- The radiator must be supplied with 230 V Single-phase 50Hz.
- The supply to the device must be directly connected to the network
after the omni-pole cut-off device with a contact opening distance of at
least 3mm without any intermediate switch (clock, mechanical relay and
static relay, ambient thermostat, etc...).
- Connecting to the network will be done using a 3 wire cable (Brown
= Phase, Blue = Neutral, Black = Pilot wire) via the intermediary of a
connection box. In humid locations such as kitchens and bathrooms, the
connection box must be installed at least 25 cm from the ground.
- The installation must be equipped with a protection device of circuit-
breaker type.
Connection to earth is forbidden.
Do not connect the pilot wire (black wire) of the device to earth.
- If the supply cable is damaged, it must be replaced by the manufacturer,
by its after-sales service or by a person of similar qualifications in order to
avoid danger.