background image

Содержание Eco-Logic

Страница 1: ...eration 2 Safety Precautions 3 Eco Logic Unit Specifications Equipment Installation Recommendations 4 Recommended System Maintenance 5 Aeration Tubing Installation Guidelines 6 Vane Replacement 7 Eco Logic features 8 Dimensional Data 9 Wiring Diagram 10 Plumbing Diagram 11 Ozone Cell parts Diagram 12 Warranty Card ...

Страница 2: ...s to circulate stagnant decaying matter on the bottom of the lakebed and begins breaking up the stratification of the lake s surface water while increasing the lake s concentration of dissolved oxygen Safety Ultraviolet rays produced inside the ozone cell of this unit are harmful to eyes and skin Never operate this unit with the ultraviolet lamp exposed or removed from the ozone chamber The ozone ...

Страница 3: ...atts or 6 Amps 2 Location Selection a Units should be installed in a properly ventilated area b The unit s front panel should be accessible as well as the lamp access cover for lamp removal c Air intakes on the bottom of unit should be a minimum of 12 off the floor d For wall mounting select a vertical structure which will support the unit e Floor mounts should be bolted to a cement pad f For outs...

Страница 4: ...ears non uniformed on the Pond s surface This can be done by removing the tubing from the pond and wiping off the tubing This task can be performed from either on shore or on board a boat 3 Ozone Cell Lamp We recommend that the lamp be replaced every 10 000 hours of operation See Price Schedule for specific part number and cost for the Ozone Cell Lamp 4 Electrostatic Air In Take Filter We recommen...

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Отзывы: