Document #9620‑20‑B‑313 Series Base Tool Changer‑06
Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 •
B-10
2.5 Tool Plate Installation
Tools required: 8 mm or 10 mm hex key
Supplies required: Clean rag, Loctite 242
1. Make sure the mounting surface of the Tool plate and tool interface plate is clean and free of debris.
2. Align the dowel pins to the corresponding holes in the Tool plate and secure the Tool plate to the tool
interface plate or customer tooling with customer supplied customer supplied (10) M10 or (10) M12
socket head cap screws using an 8 mm or 10 mm hex key. If not pre‑applied, apply Loctite 242 to threads
(see
NOTICE:
If an ATI Interface Plate is used, fasteners to mount the Tool plate is supplied with the
Interface Plate.
3.
Connect utilities to the appropriate module and Tool plate connections.
4. If installation is complete, the Tool plate may be put into normal operations.
Figure 2.2—Tool Plate Installation
Tool Plate
Dowel Pin
(Customer Supplied Hardware
or Supplied with ATI Interface Plate)
Tool Stand/Tool Interface Plate
(Customer Supplied)
(if required)
M10-1.5 Socket Head Cap Screw
(for M12-1.75 SHCS Mounting -
See Section 8 - Drawings)
(See Table 2.1 for Torque Values)
(Customer Supplied Hardware
or Supplied with ATI Interface Plate)
2.6 Tool Plate Removal
Tools required: 8 mm or 10 mm hex key
1. Place the Tool in a secure location.
2. Uncouple the Master and Tool plates.
3.
Turn off and de‑energize all energized circuits (e.g. electrical, air, water, etc.).
4. If needed, disconnect all utilities (e.g. electrical, air, water, etc.).
5. Remove the customer supplied (10) M10 or (10) M12 socket head cap screws connecting the Tool plate
to the tooling or tool interface plate using an 8 mm or 10 mm hex key.