background image

Installation and Operation Manual

 

Document #9620-20-b-mc-16 base tool changer-07 

 

Pinnacle Park

 •

 1031 Goodworth Drive 

 Apex, NC 27539 

 Tel: 919.772.0115 

 Fax: 919.772.8259 

 www.ati-ia.com 

 Email: [email protected] 

B - 9

 

3.2  Fail-Safe Operation 

The manual Tool Changer features two fail-safe features. The first feature is the cam spring 

feature. When the Master is locked, the cam is spring-loaded to bias it to keep it locked. This 

spring prevents the cam from vibrating to the unlock position as well as allows for a quick 

action lock movement when the button is pushed (see Figure 3.4). 

Figure 3.4 —Fail Safe Operation (MC-36 shown) 

 

The second fail-safe feature is the fail-safe tapered surface on the cam. As the cam is screwed 

in towards lock position, the balls roll along the first taper. The first taper simply provides the 

travel necessary to move towards lock. Then the balls roll past the intermediate tapered 

surface and onto the final tapered surface called the lock angle. This lock angle, combined 

with the tightening torque from the cam shaft, results in a high mechanical advantage and 

reliable locking force. In the event that the cam shaft is accidentally loosened, the cam may 

want to back out toward unlock position. If this happens, the balls will contact the 

intermediate “fail-safe” taper on the cam profile, and become trapped, as the forces on the 

Tool pull against the Master, the effect of this fail-safe taper strengthens. Both the cam spring 

and the fail-safe cam tapered surface act together to provide a high assurance and high level 

of safety.  

3.3  Uncoupling 

The Tool Changer should be positioned in the Tool Stand in the 

same location

 as that when 

coupling took place. 
Unscrew the cam all the way out of the lock position. Take precautions to ensure the Tool 

will not fall on your fingers. The unit will not fully disengage the Tool until the cam is all the 

way unscrewed. It is safe to remove the Master from the Tool only when the cam is in the 

fully

 unlocked position.  

 

NOTICE:

 

:

 If the unit is equipped with an optional ratchet knob pull out on the knob and 

unscrew until the ratchet knob is past the ratcheting device on the Tool Changer body . 

Содержание MC-16

Страница 1: ...ng Features 5 3 Operation 7 3 1 Coupling Sequence 7 3 2 Fail Safe Operation 9 3 3 Uncoupling 9 4 Maintenance 10 4 1 Preventive Maintenance 10 4 2 Locking Mechanism Alignment Pins Cleaning and Lubricat...

Страница 2: ...chanism The surfaces on the cam are tapered and contact balls as the rod is pushed in or tightened When the Master and Tool are brought together the user pushes the button to release the cam toward th...

Страница 3: ...pneumatic connections Figure 1 2 Tool Plate 1 3 Optional Modules There is one flat available for the mounting of the optional modules for support of various utility pass through such as electrical sig...

Страница 4: ...esigned with bolt holes and dowel holes as mounting features These features are used to accurately position and secure the Master to the robot An interface plate is utilized to adapt the Master Plate...

Страница 5: ...ional Modules 1 Depending upon the service or repair being done customer connections up to the module may or may not need to be disconnected 2 Remove the M3 socket head cap screws and lift the module...

Страница 6: ...ol float into its locked position even with small deviations in position Other Tool locating feature methods include balls and detents dowel pins in notched V grooves etc Please consult ATI for recomm...

Страница 7: ...holes on the Tool The alignment pins should be relatively concentric with the alignment holes such that they do not rub against the edge Note In Figure 3 1 through Figure 3 3 the MC036 is shown for r...

Страница 8: ...Figure 3 2 Push Button for Quick Locking Then apply the tightening torque to the knob to provide the final clamping force In lab testing 25 in lbs of tightening torque was determined to provide the op...

Страница 9: ...k angle combined with the tightening torque from the cam shaft results in a high mechanical advantage and reliable locking force In the event that the cam shaft is accidentally loosened the cam may wa...

Страница 10: ...ers and Interface Connections Inspect for proper torque and interference or wear abrasions cuts of hoses and electrical cables Tighten and correct as required O rings and Rubber Bushings Exposed o rin...

Страница 11: ...ate Locking Mechanism and Alignment Pins 3 Apply a liberal coating of lubricant to the cam locking balls and the alignment pins 4 2 2 Cleaning the Locking Mechanism and Alignment Pin Bushings Tool Pla...

Страница 12: ...Figure 4 4 Stuck Pin and Pin Block Damage 4 If stuck pins or severe pin block damage exists contact ATI for possible pin replacement procedures or module replacement 4 5 Electrical Module Seal Inspect...

Страница 13: ...hooting Proper pneumatic and electrical connections have been made to the Manual Coupler Mounting screws are properly installed Locking Cam Screw is fully tightened to approximately 25 in lbs Symptom...

Страница 14: ...ons For Other Components Section 8 Drawings Optional Ratchet Knob 9005 20 1814 Complete MC Ratchet Knob Assembly For Other Components Section 8 Drawings 7 Specifications Master and Tool Plates Suggest...

Страница 15: ...Manual Document 9620 20 b mc 16 base tool changer 07 Pinnacle Park 1031 Goodworth Drive Apex NC 27539 Tel 919 772 0115 Fax 919 772 8259 www ati ia com Email info ati ia com B 15 8 Drawings 8 1 MC 16 M...

Страница 16: ...stallation and Operation Manual Document 9620 20 b mc 16 base tool changer 07 Pinnacle Park 1031 Goodworth Drive Apex NC 27539 Tel 919 772 0115 Fax 919 772 8259 www ati ia com Email info ati ia com B...

Страница 17: ...ion Manual Document 9620 20 b mc 16 base tool changer 07 Pinnacle Park 1031 Goodworth Drive Apex NC 27539 Tel 919 772 0115 Fax 919 772 8259 www ati ia com Email info ati ia com B 17 8 2 MC 16 Manual C...

Страница 18: ...al Document 9620 20 b mc 16 base tool changer 07 Pinnacle Park 1031 Goodworth Drive Apex NC 27539 Tel 919 772 0115 Fax 919 772 8259 www ati ia com Email info ati ia com B 18 8 1 MC 16 with Quick Actio...

Страница 19: ...stallation and Operation Manual Document 9620 20 b mc 16 base tool changer 07 Pinnacle Park 1031 Goodworth Drive Apex NC 27539 Tel 919 772 0115 Fax 919 772 8259 www ati ia com Email info ati ia com B...

Страница 20: ...peration Manual Document 9620 20 b mc 16 base tool changer 07 Pinnacle Park 1031 Goodworth Drive Apex NC 27539 Tel 919 772 0115 Fax 919 772 8259 www ati ia com Email info ati ia com B 20 8 2 Manual Co...

Отзывы: