® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2020-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 8 -
2.0
INSTALLATION
The machine must be installed by an authorised person according to the instructions.
The operating instructions (including the log) are an important part
of the machine / product.
!!!PLEASE STORE CAREFULLY!!!
The product must be checked after completion of the installation, handover, if necessary briefing and then
regularly in accordance with the applicable regulations and legal provisions in the country of operation by a
suitable and approved company or facility.
Floor foundation
Requirements:
horizontal and even
Concrete thickness:
200 mm
Max. gradient:
10 mm
Concrete quality:
C20/25
Concrete curing time:
Min. 20 days
If soils do not comply with the requirements, there could evoke serious injuries to personal or
damages to the lift. Do not install the lift on
asphalt, soft concrete floor etc
.
The capacity of intermediate
ceilings must be checked by the operator
2.1
Transport & Storage Conditions
When transporting and positioning the machine, always use suitable lifting and material handling
equipment and consider the machine’s centre of gravity.
The machine should only be transported with the original packaging.
Data:
----
Width
190 cm
Length
205 cm
Height
100 cm
Storage temperature
-10 to +50 °C
Содержание Flex Lift 30
Страница 3: ...BEDIENUNGSANLEITUNG ATH Flex Lift 30 ...
Страница 47: ...OPERATING INSTRUCTIONS ATH Flex Lift 30 ...
Страница 91: ...MANUEL D UTILISATION ATH Flex Lift 30 ...
Страница 135: ...NÁVOD K OBSLUZE ATH Flex Lift 30 ...
Страница 179: ...MANUAL DE INSTRUCCIONES ATH Flex Lift 30 ...
Страница 223: ...BEDIENINGSHANDLEIDING ATH Flex Lift 30 ...
Страница 267: ...INSTRUKCJA OBŁSUGI ATH Flex Lift 30 ...
Страница 311: ...NÁVOD NA OBSLUHU ATH Flex Lift 30 ...