2.9.1. Securing the machine
It is recommended that the machine is secured to the floor at the four points provided using M8 anchor
screws and the corresponding dowels.
Drill holes, observing
the necessary drill depth
A and drill diameter of
the dowel manufacturer
Clean out the inside of
the holes
Insert the anchor bolts
into the holes until they
have reached an
appropriate depth.
Tighten the nuts to the
torque specified by the
manufacturer
Clamping thickness B
varies depending on the
floor covering
2.10
Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
Содержание 80424200937
Страница 3: ...BEDIENUNGSANLEITUNG ATH M72Z Plus ...
Страница 59: ...OPERATING INSTRUCTIONS ATH M72Z Plus ...
Страница 115: ...MANUEL D UTILISATION ATH M72Z Plus ...
Страница 171: ...NÁVOD K OBSLUZE ATH M72Z Plus ...
Страница 227: ...MANUAL DE INSTRUCCIONES ATH M72Z Plus ...
Страница 283: ...BEDIENINGSHANDLEIDING ATH M72Z Plus ...
Страница 339: ...INSTRUKCJA OBŁSUGI ATH M72Z Plus ...
Страница 395: ...NÁVOD NA OBSLUHU ATH M72Z Plus ...