www.atestgaz.pl
8.6
Scheduled maintenance
It is recommended to carry out a scheduled inspection and maintenance of the system after each three
months of its operation.
The inspection should include:
visual inspection of all system components and each individual interconnection (gas lines and
electric cabling),
run the shutoff valve test.
8.6.1
Replacement of consumables and fast wearing parts
Lifetime of consumables and fast wearing parts is listed in Table 14.
8.6.1.1 Replacement of battery in EcoAlpa5 Control Unit
To replace the EcoAlpa5 battery follow the procedure below:
disconnect the control unit from power voltage,
remove the lid and secure using 2 screws (see Figure 3),
undo bolts of the battery holder,
disconnect the battery,
replace the battery with a new one,
repeat the disassembling procedure in the reverse order.
8.6.2
Maintenance
The device does not require any specific maintenance except for cleaning the outer surface of the
enclosure. The enclosure should be cleaned by means of a soft cloth moistened with water and a bit of a
mild detergent.
8.7
Utilization
This symbol on a product or on its packaging indicates that the product
must not be disposed of with other household waste. Instead, it is the
user's responsibility to ensure disposal of waste equipment by handing it
over to a designated collection point for the recycling of waste electrical
and electronic equipment. The proper recycling of your waste equipment
at the time of disposal will help to conserve natural resources and ensure
that it is recycled in a manner that protects human health and the
environment. Information about relevant designated collection points can
be obtained from the Local Authority, waste disposal companies and in the
place of purchase. The equipment can also be returned to the
manufacturer.
s. 23|25
User Manual: POD-057-ENG R01