![ATEN PE5324kJA Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/aten/pe5324kja/pe5324kja_user-manual_2997199045.webp)
Chapter 4. Browser Operation
35
Configuration
The
Configuration
page is used to configure the settings of the eco PDU at the
individual power outlet level:
This page lets you set up the power management configuration for the selected
outlet. The meanings of the field headings are given in the following table
:
(Continues on next page.)
Heading
Meaning
Outlet Name
Each outlet can be given a distinctive name. The maximum number
of characters is 15.
Confirmation
Required
If this option is enabled (there is a check in the checkbox), a dialog
box comes up asking you to confirm a power operation before it is
performed. If it is disabled (there is no check in the checkbox), the
operation is performed without confirmation.
Содержание PE5324kJA
Страница 10: ...eco PDU PE Series User Manual x This Page Intentionally Left Blank...
Страница 18: ...eco PDU PE Series User Manual 8 Components PE5216A PE6216A Front View PE5216A PE6216A 1 2 3 4 5 8 3 4 8 6 7...
Страница 24: ...eco PDU PE Series User Manual 14 PE5324kJA Front View 1 2 3 4 3 5 6 3 7 7 7...
Страница 26: ...eco PDU PE Series User Manual 16 PE6324JA2 Front View 1 2 3 3 3 4 5 6 7 7 7...
Страница 32: ...eco PDU PE Series User Manual 22 3 4 2 1 1...
Страница 82: ...eco PDU PE Series User Manual 72 This Page Intentionally Left Blank...